Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42570
Well Classification: OW Status: PR - 2/1/2017
Well Name/No:PUMA FED #34C-35HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2017
FacilityID:444345LocationID:444338
County:WELD #123Location:SWSW 23 1N67W 6
Field:WATTENBERG - #90750Elevation:4991 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:290FSL  631 FWLLat/Long: 40.030157 / -104.865017Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030157 / -104.865018Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/7/2017
End Date: 8/14/2017
Reported: 9/12/2017
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2017             Measured TD: 17758 ft.    Vertical TD: 7769 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/16/2017
Proposed Top PZ Location:Sec:26 Twp: 1N 67W Footage: 340 FNL  510 FWL
Bottom Hole Location:Sec:35 Twp: 1N 67W Footage: 606 FSL  492 FWL
Proposed Depth/Form:17683 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 680, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8080 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 910, Top: 0 ft., Bottom: 8080 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6981 ft., Depth: 17683 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 6981 ft., Bottom: 17683 ft.

Wellbore Completed
Completion Date:3/22/2017
Spud Date:1/12/2017Spud Date Is:ACTUAL
Measured TD:17758 ft.Measured PB depth:17745 ft.
True Vertical TD:7769 ft.True Vertical PB depth:7769 ft.
Top PZ Location:Sec:26 Twp: 1N 67WFootage: 328 FNL  424 FWL
Bottom Hole Location:Sec:35 Twp: 1N 67WFootage: 738 FSL  575 FWL
Log Types:CBL, LWD/GR, (RESISTIVITY in 05-123-42568)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2222 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 862, Top: 0 ft., Bottom: 2222 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17748 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2465, Top: 325 ft., Bottom: 17748 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4722 ft.
SHARON SPRINGS7322 ft.
NIOBRARA7339 ft.
FORT HAYS7863 ft.
CODELL7919 ft.
CARLILE13017 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/6/2017                 Interval Top: 12970 ft.    Interval Bottom: 16503 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/6/2017Treatment End Date:N/A
Treatment Summary:CARLILE: 12,970-14,764; 16,199-16,207; 16,467-16,503;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12970 ft.# Of Holes:474
Interval Bottom:16503 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/6/2017                 Interval Top: 11133 ft.    Interval Bottom: 17578 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/6/2017Treatment End Date:N/A
Treatment Summary:FT HAYS: 11,133-11,285; 16,298-17,578;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11133 ft.# Of Holes:474
Interval Bottom:17578 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/2/2017                  Interval Top: 8294 ft.    Interval Bottom: 17578 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:8/30/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/7/2017Treatment End Date:8/14/2017
Treatment Summary:"PERF AND FRAC FROM 8294-17578. 229 BBL 7.5% HCL ACID, 5,218 BBL PUMP DOWN, 168,223 BBL SLICKWATER, - 173,670 TOTAL FLUID 4,959,850# 40/70 OTTAWA/ST. PETERS, - 4,959,850# TOTAL SAND.
Total fluid used in treatment (bbls):173670Max pressure during treatment (psi):7747
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):229Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):7490Total flowback volume recovered (bbls):2650
Fresh water used in treatment (bbls):165951Disposition method For flowback:RECYCLE
Total proppant used (lbs):4959850Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 98
BTU_GAS 1304
CALC_BBLS_H2O 5
CALC_BBLS_OIL 98
CALC_GOR 1622
CALC_MCF_GAS 159
CASING_PRESS 850
GRAVITY_OIL 53
MCF_GAS 159
Perforation Data:
Interval Top:8294 ft.# Of Holes:474
Interval Bottom:17578 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/6/2017                 Interval Top: 8294 ft.    Interval Bottom: 16928 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/6/2017Treatment End Date:N/A
Treatment Summary:CODELL: 8294-11,133; 11,285-12,970; 14,764-16,199; 16,207-16,467; 16,503-16,928;
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8294 ft.# Of Holes:474
Interval Bottom:16928 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)5420
Total Gas Produced (MCF)101845
GOR18790
GOR DeterminationMCFE
Average BOE per Day62.944
Average MCFE per Day365.083

 Federal Financial Assurance  i 

 Tribal Well  i No