|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2018 Measured TD: 10445 ft. Vertical TD: 4782 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/16/2017 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 400 FNL 528 FWL | | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 348 FNL 534 FWL | | Proposed Depth/Form: | 10354 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 240, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1879 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 730, Top: 0 ft., Bottom: 1879 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 10410 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1207, Top: , Bottom: 10410 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/8/2017 | | Spud Date: | 1/8/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 10445 ft. | Measured PB depth: | 10345 ft. | | True Vertical TD: | 4782 ft. | True Vertical PB depth: | 4785 ft. | | Top PZ Location: | Sec:26 Twp: 1N 67W | Footage: 313 FNL 520 FWL | | Bottom Hole Location: | Sec:35 Twp: 1N 67W | Footage: 346 FNL 522 FWL | | Log Types: | CBL, MWD, Mud, (RESISTIVITY in 123-42568) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 112 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1900 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 733, Top: 0 ft., Bottom: 1900 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 10436 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1560, Top: 154 ft., Bottom: 10436 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4713 ft. | | | |
Formation SUSX Formation Classification: OW Status: PR - 8/1/2018 Interval Top: 5128 ft. Interval Bottom: 10231 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 10/30/2017 | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/19/2017 | Treatment End Date: | 8/21/2017 | | Treatment Summary: | PERF AND FRAC FROM 5,128-10,231.
19 BBL 7.5% HCL ACID, 2,224 BBL PUMPDOWN, 12,212 BBL CWS-600, 21,103 BBL DYNAFLOW-1, 35,558 TOTAL FLUID,
3,261,280 # 20/40 OTTAWA/ST. PETERS,128,220 # 20/40 SANTROL/SUPER LC, 3,389,500# TOTAL SAND. | | Total fluid used in treatment (bbls): | 35558 | Max pressure during treatment (psi): | 4077 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 19 | Min frac gradient (psi/ft): | 0.63 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 35539 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3389500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 4396 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/18/2017 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 245 | | BBLS_OIL | 5 | | BTU_GAS | 1310 | | CALC_BBLS_H2O | 245 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 231 | | GRAVITY_OIL | 53 | | MCF_GAS | 10 | | TUBING_PRESS | 248 |
| | Perforation Data: | | Interval Top: | 5128 ft. | # Of Holes: | 330 | | Interval Bottom: | 10231 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2237 |
| Total Gas Produced (MCF) | 8787 |
| GOR | 3928 |
| GOR Determination | BOE |
| Average BOE per Day | 10.288 |
| Average MCFE per Day | 59.669 |
| Federal Financial Assurance | i | |
|
|