|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2019 Measured TD: 16840 ft. Vertical TD: 6983 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/13/2017 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 67W | Footage: 2120 FNL 460 FWL | | Bottom Hole Location: | Sec:24 Twp: 6N 67W | Footage: 2120 FNL 460 FEL | | Proposed Depth/Form: | 16944 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16944 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1600, Top: 1500 ft., Bottom: 16944 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/5/2017 | | Spud Date: | 2/14/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 16840 ft. | Measured PB depth: | 16820 ft. | | True Vertical TD: | 6983 ft. | True Vertical PB depth: | 6983 ft. | | Top PZ Location: | Sec:23 Twp: 6N 67W | Footage: 2114 FNL 508 FWL | | Bottom Hole Location: | Sec:24 Twp: 6N 67W | Footage: 2144 FNL 519 FEL | | Log Types: | CBL, MUD, MWD/LWD, (Dual Induction on API 123-42559). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1556 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1556 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16825 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2700, Top: 180 ft., Bottom: 16825 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3529 ft. | | N | N | | SUSSEX | 4050 ft. | | N | N | | SHANNON | 4597 ft. | | N | N | | SHARON SPRINGS | 6889 ft. | | N | N | | NIOBRARA | 6949 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/1/2019 Interval Top: 7331 ft. Interval Bottom: 16778 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/15/2018 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/19/2017 | Treatment End Date: | 8/10/2017 | | Treatment Summary: | 80 stage plug and perf;
351325 total bbls fluid pumped: 331493 bbls fresh water, 18897 bbls recycled water, and 935 bbls 15% HCl acid;
25600290 lbs of 40/70 proppant pumped. | | Total fluid used in treatment (bbls): | 351325 | Max pressure during treatment (psi): | 9319 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 80 | | Total acid used in treatment (bbls): | 935 | Min frac gradient (psi/ft): | 0.98 | | Recycled water used in treatment (bbls): | 18897 | Total flowback volume recovered (bbls): | 7819 | | Fresh water used in treatment (bbls): | 331493 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 25600290 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7201 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/27/2017 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 626 | | BBLS_OIL | 501 | | BTU_GAS | 1285 | | CALC_BBLS_H2O | 626 | | CALC_BBLS_OIL | 501 | | CALC_GOR | 874 | | CALC_MCF_GAS | 438 | | CASING_PRESS | 680 | | GRAVITY_OIL | 43 | | MCF_GAS | 438 | | TUBING_PRESS | 1505 |
| | Perforation Data: | | Interval Top: | 7331 ft. | # Of Holes: | 2845 | | Interval Bottom: | 16778 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 7047 |
| Total Gas Produced (MCF) | 105232 |
| GOR | 14932 |
| GOR Determination | BOE |
| Average BOE per Day | 68.768 |
| Average MCFE per Day | 398.857 |
| Federal Financial Assurance | i | |
|
|