Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42556
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:Stromberger #6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:444317LocationID:444315
County:WELD #123Location:SENE 22 6N67W 6
Field:WATTENBERG - #90750Elevation:4778 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2026FNL  150 FELLat/Long: 40.474147 / -104.870861Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.474145 / -104.870860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2017
End Date: 7/8/2017
Reported: 8/16/2017
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2019             Measured TD: 17060 ft.    Vertical TD: 7173 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/13/2017
Proposed Top PZ Location:Sec:23 Twp: 6N 67W Footage: 1820 FNL  460 FWL
Bottom Hole Location:Sec:24 Twp: 6N 67W Footage: 1820 FNL  460 FEL
Proposed Depth/Form:17147 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17147 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1600, Top: 1500 ft., Bottom: 17147 ft.

Wellbore Completed
Completion Date:3/31/2017
Spud Date:2/15/2017Spud Date Is:ACTUAL
Measured TD:17060 ft.Measured PB depth:17047 ft.
True Vertical TD:7173 ft.True Vertical PB depth:7173 ft.
Top PZ Location:Sec:23 Twp: 6N 67WFootage: 1759 FNL  518 FWL
Bottom Hole Location:Sec:24 Twp: 6N 67WFootage: 1856 FNL  547 FEL
Log Types:CBL, MUD, MWD/LWD, (Dual Induction on API 123-42559).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1558 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1558 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17047 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2700, Top: 140 ft., Bottom: 17047 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3532 ft.NN
SUSSEX4050 ft.NN
SHANNON4609 ft.NN
SHARON SPRINGS6829 ft.NN
NIOBRARA6872 ft.NN
FORT HAYS7262 ft.NN
CODELL7398 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/2/2018                  Interval Top: 13126 ft.    Interval Bottom: 14200 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/2/2018Treatment End Date:N/A
Treatment Summary:Producing interval: 13126'-14200'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13126 ft.# Of Holes:198
Interval Bottom:14200 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/1/2019                  Interval Top: 7585 ft.    Interval Bottom: 16994 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/16/2017Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/24/2017Treatment End Date:7/8/2017
Treatment Summary:48 stage plug and perf; 162882 total bbls fluid pumped: 154086 bbls fresh water, 8784 bbls recycled water, and 12 bbls 15% HCl acid pumped; 9599920 lbs of 30/50 proppant pumped.
Total fluid used in treatment (bbls):162882Max pressure during treatment (psi):9084
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):8784Total flowback volume recovered (bbls):1749
Fresh water used in treatment (bbls):154086Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9599920Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7348 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/17/2017Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 512
BBLS_OIL 539
BTU_GAS 1285
CALC_BBLS_H2O 512
CALC_BBLS_OIL 539
CALC_GOR 996
CALC_MCF_GAS 537
CASING_PRESS 788
GRAVITY_OIL 43
MCF_GAS 537
TUBING_PRESS 1538
Perforation Data:
Interval Top:7585 ft.# Of Holes:1729
Interval Bottom:16994 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/2/2018                  Interval Top: 7585 ft.    Interval Bottom: 16994 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/2/2018Treatment End Date:N/A
Treatment Summary:Producing intervals: 7585'-13126'; 14200'-16994'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7585 ft.# Of Holes:1531
Interval Bottom:16994 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)5936
Total Gas Produced (MCF)135563
GOR22837
GOR DeterminationMCFE
Average BOE per Day80.175
Average MCFE per Day465.051

 Federal Financial Assurance  i 

 Tribal Well  i No