Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-42462
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:GUEST #28C-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:444030LocationID:331598
County:WELD #123Location:NESW 13 2N65W 6
Field:WATTENBERG - #90750Elevation:4872 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2390FSL  1997 FWLLat/Long: 40.137758 / -104.614427Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.137757 / -104.614428Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/4/2017
End Date: 11/11/2017
Reported: 12/20/2017
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 15842 ft.    Vertical TD: 7142 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/19/2017
Proposed Top PZ Location:Sec:13 Twp: 2N 65W Footage: 2588 FSL  2453 FWL
Bottom Hole Location:Sec:1 Twp: 2N 65W Footage: 399 FSL  2498 FWL
Proposed Depth/Form:15037 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1512 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1512 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15753 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1860, Top: , Bottom: 15753 ft.

Wellbore Completed
Completion Date:3/5/2017
Spud Date:2/7/2017Spud Date Is:ACTUAL
Measured TD:15842 ft.Measured PB depth:15739 ft.
True Vertical TD:7142 ft.True Vertical PB depth:7143 ft.
Top PZ Location:Sec:13 Twp: 2N 65WFootage: 2588 FSL  2453 FWL
Bottom Hole Location:Sec:1 Twp: 2N 65WFootage: 399 FSL  2498 FWL
Log Types:CBL, MWD, (CNL in 123-42455, IND in 123-20962)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1865 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 725, Top: 0 ft., Bottom: 1865 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15832 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2070, Top: 27 ft., Bottom: 15832 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4348 ft.
SHARON SPRINGS6854 ft.
NIOBRARA6916 ft.
FORT HAYS7400 ft.
CODELL7474 ft.
CARLILE7603 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/13/2017                Interval Top: 14686 ft.    Interval Bottom: 15009 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2017Treatment End Date:N/A
Treatment Summary:Fort Hays: 14686-14847, 14885-15009
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14686 ft.# Of Holes:478
Interval Bottom:15009 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/13/2017                Interval Top: 7593 ft.    Interval Bottom: 11724 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2017Treatment End Date:N/A
Treatment Summary:Carlile: 7593-7732, 11649-11724
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7593 ft.# Of Holes:478
Interval Bottom:11724 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 3/1/2025                  Interval Top: 7565 ft.    Interval Bottom: 15629 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:11/23/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/31/2017Treatment End Date:11/11/2017
Treatment Summary:PERF AND FRAC FROM 7,565-15,629. 233 BBL HCL-7.5%, 146,083 BBL SLICKWATER, 5,501 BBL PUMPDOWN, 151,818 TOTAL FLUID, 4,420,230 # 40/70 OTTAWA/ ST. PETERS, 4,420,230 # TOTAL SAND.
Total fluid used in treatment (bbls):151818Max pressure during treatment (psi):7909
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):233Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10188
Fresh water used in treatment (bbls):151585Disposition method For flowback:RECYCLE
Total proppant used (lbs):4420230Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7016 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/4/2017Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 49
BTU_GAS 1339
CALC_BBLS_H2O 16
CALC_BBLS_OIL 49
CALC_GOR 2245
CALC_MCF_GAS 110
CASING_PRESS 2000
GRAVITY_OIL 54
MCF_GAS 110
TUBING_PRESS 1250
Perforation Data:
Interval Top:7565 ft.# Of Holes:478
Interval Bottom:15629 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/13/2017                Interval Top: 7565 ft.    Interval Bottom: 15629 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2017Treatment End Date:N/A
Treatment Summary:Codell: 7565-7593, 7732-11649, 11724-14686, 14847-14885, 14847, 15009-15629
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7565 ft.# Of Holes:478
Interval Bottom:15629 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5041
Total Gas Produced (MCF)49507
GOR9820
GOR DeterminationBOE
Average BOE per Day40.354
Average MCFE per Day234.074

 Federal Financial Assurance  i 

 Tribal Well  i No