|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 11975 ft. Vertical TD: 7099 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/26/2017 | Proposed Top PZ Location: | Sec:9 Twp: 1N 65W | Footage: 461 FSL 185 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 65W | Footage: 460 FNL 227 FEL | Proposed Depth/Form: | 11908 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1514 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 0 ft., Bottom: 1514 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 11908 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1518, Top: 1400 ft., Bottom: 11908 ft. |
| | |
Wellbore Completed | Completion Date: | 7/9/2015 | Spud Date: | 6/18/2015 | Spud Date Is: | ACTUAL | Measured TD: | 11975 ft. | Measured PB depth: | 11867 ft. | True Vertical TD: | 7099 ft. | True Vertical PB depth: | 7098 ft. | Top PZ Location: | Sec:9 Twp: 1N 65W | Footage: 632 FSL 211 FEL | Bottom Hole Location: | Sec:9 Twp: 1N 65W | Footage: 460 N 216 E | Log Types: | cbl, gr, cnl | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: 42.1 , Citings Type: ACTUAL | Cement: | Sacks: 32, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1835 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 682, Top: 0 ft., Bottom: 1835 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11961 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1712, Top: 55 ft., Bottom: 11961 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4494 ft. | | | | SHARON SPRINGS | 7275 ft. | | | | NIOBRARA | 7317 ft. | | | |
Formation NBRR Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 7764 ft. Interval Bottom: 11858 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/22/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/3/2016 | Treatment End Date: | 1/11/2016 | Treatment Summary: | "PERF AND FRAC FROM 7764-11,858.
369 BBL HCl ACID, 148,273 BBL SLICKWATER, 3,216 BBL TREATED WATER, - 151,858 BBL TOTAL FLUID
4,488,400# 40/70 OTTAWA/ST. PETERS,- 4,488,400# TOTAL SAND."
| Total fluid used in treatment (bbls): | 151859 | Max pressure during treatment (psi): | 7487 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 21 | Total acid used in treatment (bbls): | 369 | Min frac gradient (psi/ft): | 0.89 | Recycled water used in treatment (bbls): | 1200 | Total flowback volume recovered (bbls): | 28863 | Fresh water used in treatment (bbls): | 150290 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4488400 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/9/2016 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 510 | BBLS_OIL | 51 | BTU_GAS | 1333 | CALC_BBLS_H2O | 510 | CALC_BBLS_OIL | 51 | CALC_GOR | 1725 | CALC_MCF_GAS | 88 | CASING_PRESS | 1000 | GRAVITY_OIL | 50 | MCF_GAS | 88 |
| Perforation Data: | Interval Top: | 7764 ft. | # Of Holes: | 304 | Interval Bottom: | 11858 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 12/15/2022 |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|