Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41112
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Arellano #N-10-9HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:440767LocationID:440761
County:WELD #123Location:NESE 10 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1579FSL  303 FELLat/Long: 40.410928 / -104.641114Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.410929 / -104.641114Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/27/2016
End Date: 2/13/2016
Reported: 4/18/2016
Days to report: 65
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 13944 ft.    Vertical TD: 6844 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/2/2017
Proposed Top PZ Location:Sec:10 Twp: 5N 65W Footage: 1873 FSL  827 FEL
Bottom Hole Location:Sec:9 Twp: 5N 65W Footage: 1871 FSL  2168 FEL
Proposed Depth/Form:13978 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 333, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7315 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 573, Top: 0 ft., Bottom: 7315 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6615 ft., Depth: 13978 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 565, Top: 6615 ft., Bottom: 13978 ft.

Wellbore Completed
Completion Date:5/19/2015
Spud Date:3/29/2015Spud Date Is:ACTUAL
Measured TD:13944 ft.Measured PB depth:13944 ft.
True Vertical TD:6844 ft.True Vertical PB depth:6844 ft.
Top PZ Location:Sec:10 Twp: 5N 65WFootage: 1873 FSL  827 FEL
Bottom Hole Location:Sec:9 Twp: 5N 65WFootage: 1871 FSL  2168 FEL
Log Types:MWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 790 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7301 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 20 ft., Bottom: 7301 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6605 ft., Depth: 13940 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3590 ft.NN
SUSSEX4303 ft.4492 ft.NN
SHARON SPRINGS6608 ft.NN
NIOBRARA6695 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7380 ft.    Interval Bottom: 13944 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/27/2016Treatment End Date:2/13/2016
Treatment Summary:Frac 43 Stages (sleeves & swell packers) with 137,683 bbl Hybrid fluid (Slickwater & crosslink) and 7,787,881 lbs. sand
Total fluid used in treatment (bbls):137683Max pressure during treatment (psi):8451
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6971
Fresh water used in treatment (bbls):137683Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7787881Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6704 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2016Test Method:flowing
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 403
BBLS_OIL 319
BTU_GAS 1306
CALC_BBLS_H2O 403
CALC_BBLS_OIL 319
CALC_GOR 4166
CALC_MCF_GAS 1329
GRAVITY_OIL 55
MCF_GAS 1329
TUBING_PRESS 2250
Perforation Data:
Interval Top:7380 ft.# Of Holes:
Interval Bottom:13944 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)422
Total Gas Produced (MCF)9825
GOR23281
GOR DeterminationMCFE
Average BOE per Day5.688
Average MCFE per Day32.989

 Federal Financial Assurance  i 

 Tribal Well  i No