Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41110
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Arellano #O-10-9HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:440765LocationID:440761
County:WELD #123Location:NESE 10 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1565FSL  309 FELLat/Long: 40.410889 / -104.641133Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.410891 / -104.641133Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/27/2016
End Date: 2/18/2016
Reported: 4/18/2016
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 13948 ft.    Vertical TD: 6851 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/2/2017
Proposed Top PZ Location:Sec:10 Twp: 5N 65W Footage: 1487 FSL  820 FEL
Bottom Hole Location:Sec:9 Twp: 5N 65W Footage: 1486 FSL  2170 FEL
Proposed Depth/Form:13975 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 333, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7310 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 573, Top: 0 ft., Bottom: 7310 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6610 ft., Depth: 13975 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 565, Top: 6610 ft., Bottom: 13975 ft.

Wellbore Completed
Completion Date:5/24/2015
Spud Date:3/29/2015Spud Date Is:ACTUAL
Measured TD:13948 ft.Measured PB depth:13948 ft.
True Vertical TD:6851 ft.True Vertical PB depth:6851 ft.
Top PZ Location:Sec:10 Twp: 5N 65WFootage: 1487 FSL  820 FEL
Bottom Hole Location:Sec:9 Twp: 5N 65WFootage: 1486 FSL  2170 FEL
Log Types:MWD, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 790 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7283 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 34 ft., Bottom: 7283 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6801 ft., Depth: 13944 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3613 ft.NN
SUSSEX4305 ft.4430 ft.NN
SHARON SPRINGS6615 ft.NN
NIOBRARA6685 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7335 ft.    Interval Bottom: 13948 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/27/2016Treatment End Date:2/18/2016
Treatment Summary:Frac 43 Stages (sleeves & swell packers) with 114,615 bbl Hybrid fluid (Slickwater & crosslink) and 7,792,820 lbs. sand
Total fluid used in treatment (bbls):114615Max pressure during treatment (psi):8451
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3761
Fresh water used in treatment (bbls):114615Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7792820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2016Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 359
BTU_GAS 1306
CALC_BBLS_H2O 194
CALC_BBLS_OIL 359
CALC_GOR 2794
CALC_MCF_GAS 1003
CASING_PRESS 2250
GRAVITY_OIL 55
MCF_GAS 1003
Perforation Data:
Interval Top:7335 ft.# Of Holes:
Interval Bottom:13948 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)456
Total Gas Produced (MCF)6604
GOR14482
GOR DeterminationBOE
Average BOE per Day4.285
Average MCFE per Day24.863

 Federal Financial Assurance  i 

 Tribal Well  i No