Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41048
Well Classification: OW Status: PR - 2/1/2026
Well Name/No:State Antelope #B11-V41-2HNC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:OG8039.4
Facility Status:PRStatus Date2/1/2026
FacilityID:159799LocationID:159738
County:WELD #123Location:LOT4 2 5N62W 6
Field:WATTENBERG - #90750Elevation:4649 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1322FNL  405 FWLLat/Long: 40.433142 / -104.298583Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.433139 / -104.298585Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/30/2015
End Date: 4/1/2015
Reported: 6/4/2015
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2026             Measured TD: 10905 ft.    Vertical TD: 6270 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/20/2017
Proposed Top PZ Location:Sec:2 Twp: 5N 62W Footage: 990 FNL  682 FWL
Bottom Hole Location:Sec:2 Twp: 5N 62W Footage: 998 FNL  476 FEL
Proposed Depth/Form:10920 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 410 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6642 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 2500 ft., Bottom: 6642 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6542 ft., Depth: 10920 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:3/23/2015
Spud Date:3/16/2015Spud Date Is:ACTUAL
Measured TD:10905 ft.Measured PB depth:10854 ft.
True Vertical TD:6270 ft.True Vertical PB depth:6270 ft.
Top PZ Location:Sec:2 Twp: 5N 62WFootage: 990 FNL  682 FWL
Bottom Hole Location:Sec:2 Twp: 5N 62WFootage: 998 FNL  476 FEL
Log Types:Mud Log, CBL, (Open Hole log ran on the State Antelope 11-41-2HNC, same pad)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 446 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 446 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6611 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 0 ft., Bottom: 6611 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6469 ft., Depth: 10897 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6085 ft.NN
NIOBRARA6215 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2026                  Interval Top: 6728 ft.    Interval Bottom: 10905 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/21/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/31/2015Treatment End Date:4/1/2015
Treatment Summary:25 Stage Niobrara pumped a total of 60,166 bbls of fluid (Phazer) and 3,750,000 # of sand (40/70 Ottawa, 30/50 Ottawa); ATP 4,238 psi, ATR 50.00 bpm, Final ISDP 3,029 psi; completed with sliding sleeves and casing packers.
Total fluid used in treatment (bbls):60166Max pressure during treatment (psi):5337
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8027
Fresh water used in treatment (bbls):60166Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3750000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6403 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2015Test Method:Flowing
Hours Tested:72Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1737
BBLS_OIL 204
BTU_GAS 1311
CALC_BBLS_H2O 579
CALC_BBLS_OIL 68
CALC_GOR 1529
CALC_MCF_GAS 104
CASING_PRESS 881
GRAVITY_OIL 43
MCF_GAS 312
TUBING_PRESS 225
Perforation Data:
Interval Top:6728 ft.# Of Holes:
Interval Bottom:10905 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.003
Average MCFE per Day0.016

 Federal Financial Assurance  i 

 Tribal Well  i No