|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 13303 ft. Vertical TD: 6808 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/22/2016 | | Proposed Top PZ Location: | Sec:18 Twp: 6N 63W | Footage: 1814 FNL 622 FEL | | Bottom Hole Location: | Sec:13 Twp: 6N 64W | Footage: 1815 FNL 1640 FEL | | Proposed Depth/Form: | 13366 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 240, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7216 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: , Bottom: 7216 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7066 ft., Depth: 13366 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/17/2015 | | Spud Date: | 4/10/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 13303 ft. | Measured PB depth: | 13284 ft. | | True Vertical TD: | 6808 ft. | True Vertical PB depth: | 6808 ft. | | Top PZ Location: | Sec:18 Twp: 6N 63W | Footage: 1859 FNL 637 FEL | | Bottom Hole Location: | Sec:13 Twp: 6N 64W | Footage: 1779 FNL 1639 FEL | | Log Types: | CBL/Mud/Gamma, The designated resistivity log on this pad will be; Colt 13-655, 123-40908 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.9 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 898 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 898 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7065 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 1175 ft., Bottom: 7065 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6996 ft., Depth: 13293 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 972 ft. | | | | | PARKMAN | 3503 ft. | | | | | SUSSEX | 4105 ft. | | | | | SHANNON | 4804 ft. | | | | | NIOBRARA | 6567 ft. | | | | | FORT HAYS | 6950 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 4/7/2020 Interval Top: 7439 ft. Interval Bottom: 13211 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 9/9/2015 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/30/2020 | Treatment End Date: | N/A | | Treatment Summary: | Ft. Hays Intervals: 7439-7968; 7994-8728; 8985-10404; 10469-12616; 12845-13211 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/17/2017 | Treatment End Date: | N/A | | Treatment Summary: | Ft. Hays Intervals: 7198-9525, 9706-10481, 12400-13211 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7439 ft. | # Of Holes: | 0 | | Interval Bottom: | 13211 ft. | Hole Size: | |
|
Formation CD-FH Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 7198 ft. Interval Bottom: 13211 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 9/9/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/17/2015 | Treatment End Date: | 8/19/2015 | | Treatment Summary: | Frac'd the Ft. Hays-Codell w/ 5194872 gals of Silverstim and Slick Water with 5224341#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 123687 | Max pressure during treatment (psi): | 6575 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 31 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 1.05 | | Recycled water used in treatment (bbls): | 5775 | Total flowback volume recovered (bbls): | 309 | | Fresh water used in treatment (bbls): | 117912 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5224341 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6996 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/16/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 665 | | BBLS_OIL | 359 | | CALC_BBLS_H2O | 665 | | CALC_BBLS_OIL | 359 | | CALC_GOR | 1314 | | CALC_MCF_GAS | 472 | | MCF_GAS | 472 |
| | Perforation Data: | | Interval Top: | 7198 ft. | # Of Holes: | 31 | | Interval Bottom: | 13211 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 6/30/2020 Interval Top: 7198 ft. Interval Bottom: 12845 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/9/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/30/2020 | Treatment End Date: | N/A | | Treatment Summary: | Codell Intervals 7198-7439; 7968-7994; 8728-8985; 10404-10469; 12616-12845 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7198 ft. | # Of Holes: | 0 | | Interval Bottom: | 12845 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4883 |
| Total Gas Produced (MCF) | 64374 |
| GOR | 13183 |
| GOR Determination | BOE |
| Average BOE per Day | 43.807 |
| Average MCFE per Day | 254.081 |
| Federal Financial Assurance | i | |
|
|