Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40588
Well Classification: OW Status: PR - 7/27/2016
Well Name/No:DOCHEFF #34N-13HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/27/2016
FacilityID:439887LocationID:439886
County:WELD #123Location:SESW 14 3N68W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:975FSL  1513 FWLLat/Long: 40.221609 / -104.974216Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.221603 / -104.974205Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/4/2016
End Date: 7/9/2016
Reported: 7/29/2016
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/27/2016             Measured TD: 12637 ft.    Vertical TD: 7207 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/27/2016
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:14 Twp: 3N 68W Footage: 200 FSL  600 FWL
Bottom Hole Location:Sec:13 Twp: 3N 68W Footage: 200 FSL  300 FWL
Proposed Depth/Form:12707 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1830 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1830 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12626 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1311, Top: , Bottom: 12626 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6764 ft., Depth: 12707 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/26/2016
Spud Date:4/15/2016Spud Date Is:ACTUAL
Measured TD:12637 ft.Measured PB depth:12533 ft.
True Vertical TD:7207 ft.True Vertical PB depth:7208 ft.
Top PZ Location:Sec:14 Twp: 3N 68WFootage: 215 FSL  694 FWL
Bottom Hole Location:Sec:13 Twp: 3N 68WFootage: 189 FSL  294 FWL
Log Types:CBL, MWD/GR, (IND in 05-123-08345)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 56, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1891 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 702, Top: 0 ft., Bottom: 1891 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12627 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1590, Top: 204 ft., Bottom: 12627 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4281 ft.
SHARON SPRINGS7321 ft.
NIOBRARA7425 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/27/2016                 Interval Top: 7796 ft.    Interval Bottom: 12524 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/18/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/4/2016Treatment End Date:7/9/2016
Treatment Summary:"PERF AND FRAC FROM 7796-12,524. 10 BBL 7.5% HCL ACID, 128,618 BBL SLICKWATER, 3,919 BBL WATER, - 132,547 BBL TOTAL FLUID 623,722# 100 MESH PREMIUM, 3,284,452# 40/70 PREMIUM, - 3,908,174# TOTAL SAND."
Total fluid used in treatment (bbls):132547Max pressure during treatment (psi):7183
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):10Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):13619
Fresh water used in treatment (bbls):132538Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3908174Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 605
BBLS_OIL 50
BTU_GAS 1375
CALC_BBLS_H2O 605
CALC_BBLS_OIL 50
CALC_GOR 1540
CALC_MCF_GAS 77
CASING_PRESS 1550
GRAVITY_OIL 48
MCF_GAS 77
Perforation Data:
Interval Top:7796 ft.# Of Holes:423
Interval Bottom:12524 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2454
Total Gas Produced (MCF)56683
GOR23098
GOR DeterminationMCFE
Average BOE per Day33.324
Average MCFE per Day193.307

 Federal Financial Assurance  i 

 Tribal Well  i No