Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40503
Well Classification: OW Status: SI - 2/1/2025
Well Name/No:Drake #01N-65W-22-8N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:439584LocationID:439583
County:WELD #123Location:SESE 22 1N65W 6
Field:WATTENBERG - #90750Elevation:5090 ft.
Planned Location:213FSL  1309 FELLat/Long: 40.030235 / -104.645426Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.030238 / -104.645424Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/31/2014
End Date: 1/4/2015
Reported: 1/5/2015
Days to report: 1
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 2/1/2025             Measured TD: 11770 ft.    Vertical TD: 7212 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/30/2016
Proposed Top PZ Location:Sec:22 Twp: 1N 65W Footage: 460 FSL  825 FEL
Bottom Hole Location:Sec:22 Twp: 1N 65W Footage: 460 FNL  825 FEL
Proposed Depth/Form:11902 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 1150, Top: 0 ft., Bottom: 1300 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7556 ft., Weight: 26# , Citings Type: PLANNED
Cement:Sacks: 750, Top: 2500 ft., Bottom: 7556 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11902 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 450, Top: 5000 ft., Bottom: 11902 ft.

Wellbore Completed
Completion Date:11/25/2014
Spud Date:11/9/2014Spud Date Is:ACTUAL
Measured TD:11770 ft.Measured PB depth:11737 ft.
True Vertical TD:7212 ft.True Vertical PB depth:7212 ft.
Top PZ Location:Sec:22 Twp: 1N 65WFootage: 765 FSL  822 FEL
Bottom Hole Location:Sec:22 Twp: 1N 65WFootage: 466 N  867 E
Log Types:MWD, CBL, Mud
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1295 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 18 ft., Bottom: 1295 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7620 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 7620 ft., Determination Method: VISU
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11743 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 422, Top: 3840 ft., Bottom: 11743 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4669 ft.
SHARON SPRINGS7150 ft.
NIOBRARA7177 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 2/1/2025                  Interval Top: 7708 ft.    Interval Bottom: 11682 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/10/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/29/2014Treatment End Date:1/4/2015
Treatment Summary:20 stages: Frac'd with 87,376 bbls of slickwater, 699 bbls of 15% HCl acid, and 3,155,614 lbs of 20/40 proppant.
Total fluid used in treatment (bbls):88075Max pressure during treatment (psi):8770
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.84
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):699Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7093
Fresh water used in treatment (bbls):87376Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3155614Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/21/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 275
BBLS_OIL 250
BTU_GAS 1300
CALC_BBLS_H2O 275
CALC_BBLS_OIL 250
CALC_GOR 636
CALC_MCF_GAS 185
CASING_PRESS 600
GRAVITY_OIL 40
MCF_GAS 185
Perforation Data:
Interval Top:7708 ft.# Of Holes:640
Interval Bottom:11682 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)676
Total Gas Produced (MCF)1176
GOR1739
GOR DeterminationBOE
Average BOE per Day2.422
Average MCFE per Day14.040

 Federal Financial Assurance  i 

 Tribal Well  i No