|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 16872 ft. Vertical TD: 6966 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/24/2016 | | Proposed Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 2475 FSL 460 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 2475 FSL 460 FWL | | Proposed Depth/Form: | 17031 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 398, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7565 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 727, Top: 3000 ft., Bottom: 7565 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7545 ft., Depth: 17031 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/13/2014 | | Spud Date: | 10/30/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 16872 ft. | Measured PB depth: | 16865 ft. | | True Vertical TD: | 6966 ft. | True Vertical PB depth: | 6966 ft. | | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 2454 FSL 534 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 2546 FSL 510 FWL | | Log Types: | CBL, MUD, Triple Combo, (MWD/LWD w/ Triple Combo on 123-40317). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 796 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 796 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7471 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 771, Top: 350 ft., Bottom: 7471 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7368 ft., Depth: 16865 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 807, Top: 7368 ft., Bottom: 16865 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3553 ft. | | | | | SUSSEX | 4308 ft. | | | | | SHANNON | 4692 ft. | | | | | SHARON SPRINGS | 7010 ft. | | | | | NIOBRARA | 7053 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 7531 ft. Interval Bottom: 16780 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/10/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/8/2015 | Treatment End Date: | 7/12/2015 | | Treatment Summary: | 15 stage plug and perf; mechanical failure caused completion to be delayed on 5/10/2015 to 7/1/2015.
Fluid: Crosslink Gel. Proppant: 5,026,127 lbs 40/70 white. Acid: 7.5% HCl | | Total fluid used in treatment (bbls): | 56725 | Max pressure during treatment (psi): | 9211 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.32 | | Type Of gas: | | Number Of staged intervals: | 15 | | Total acid used in treatment (bbls): | 659 | Min frac gradient (psi/ft): | 0.99 | | Recycled water used in treatment (bbls): | 12318 | Total flowback volume recovered (bbls): | 415 | | Fresh water used in treatment (bbls): | 43748 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5026127 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7338 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/10/2015 | Test Method: | | | Hours Tested: | 6 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 226 | | BBLS_OIL | 66 | | BTU_GAS | 1373 | | CALC_BBLS_H2O | 904 | | CALC_BBLS_OIL | 264 | | CALC_GOR | 773 | | CALC_MCF_GAS | 204 | | GRAVITY_OIL | 42 | | MCF_GAS | 51 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7531 ft. | # Of Holes: | 576 | | Interval Bottom: | 16780 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1515 |
| Total Gas Produced (MCF) | 4300 |
| GOR | 2838 |
| GOR Determination | BOE |
| Average BOE per Day | 6.170 |
| Average MCFE per Day | 35.792 |
| Federal Financial Assurance | i | |
|
|