Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40316
Well Classification: OW Status: PR - 4/24/2015
Well Name/No:THOMSEN #1N-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/24/2015
FacilityID:439096LocationID:305907
County:WELD #123Location:NENE 7 2N65W 6
Field:WATTENBERG - #90750Elevation:4912 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:472FNL  995 FELLat/Long: 40.159139 / -104.700670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.159140 / -104.700671Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/7/2015
End Date: 4/13/2015
Reported: 6/8/2015
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/24/2015             Measured TD: 13074 ft.    Vertical TD: 7101 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/24/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/24/2016
Proposed Top PZ Location:Sec:7 Twp: 2N 65W Footage: 171 FNL  1958 FEL
Bottom Hole Location:Sec:18 Twp: 2N 65W Footage: 293 FNL  2055 FEL
Proposed Depth/Form:13958 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1279 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 1279 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7846 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 7846 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6846 ft., Depth: 13958 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/25/2014
Spud Date:10/8/2014Spud Date Is:ACTUAL
Measured TD:13074 ft.Measured PB depth:13064 ft.
True Vertical TD:7101 ft.True Vertical PB depth:7101 ft.
Top PZ Location:Sec:7 Twp: 2N 65WFootage: 171 FNL  1958 FEL
Bottom Hole Location:Sec:18 Twp: 2N 65WFootage: 293 FNL  2055 FEL
Log Types:CBL, LWD, (RESISTIVITY in 123-23655, 123-33264, 123-23654)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1359 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 544, Top: 0 ft., Bottom: 1359 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7696 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 935 ft., Bottom: 7696 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6642 ft., Depth: 13064 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST LINER , Top: 6691 ft., Depth: 6766 ft., Bottom: 13064 ft., Sacks: 415, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4689 ft.
SHARON SPRINGS7228 ft.
NIOBRARA7361 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/24/2015                 Interval Top: 7706 ft.    Interval Bottom: 12929 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/17/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/7/2015Treatment End Date:4/13/2015
Treatment Summary:"PERF AND FRAC FROM 7706-12,929. 143,596 BBL SLICKWATER, - 143,596 BBL TOTAL FLUID 536,020# 30/50 OTTAWA/ST. PETERS, 4,052,450# 40/70 OTTAWA/ST. PETERS, - 4,588,470# TOTAL SAND."
Total fluid used in treatment (bbls):143596Max pressure during treatment (psi):7313
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2554
Fresh water used in treatment (bbls):143596Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4588470Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/24/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 117
BBLS_OIL 83
BTU_GAS 1217
CALC_BBLS_H2O 117
CALC_BBLS_OIL 83
CALC_GOR 2410
CALC_MCF_GAS 200
CASING_PRESS 625
GRAVITY_OIL 51
MCF_GAS 200
Perforation Data:
Interval Top:7706 ft.# Of Holes:618
Interval Bottom:12929 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5009
Total Gas Produced (MCF)100889
GOR20141
GOR DeterminationMCFE
Average BOE per Day61.335
Average MCFE per Day355.705

 Federal Financial Assurance  i 

 Tribal Well  i No