Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40292
Well Classification: OW Status: SI - 12/1/2023
Well Name/No:Sprague #3AA-9H-N267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2023
FacilityID:439066LocationID:302199
County:WELD #123Location:SESW 9 2N67W 6
Field:WATTENBERG - #90750Elevation:4982 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:521FSL  1667 FWLLat/Long: 40.147017 / -104.898664Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.147017 / -104.898663Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/12/2015
End Date: 6/17/2015
Reported: 7/13/2015
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2023             Measured TD: 12991 ft.    Vertical TD: 7526 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/23/2016
Proposed Top PZ Location:Sec:9 Twp: 2N 67W Footage: 779 FSL  162 FWL
Bottom Hole Location:Sec:4 Twp: 2N 67W Footage: 439 FSL  121 FWL
Proposed Depth/Form:13087 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8107 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 460, Top: 500 ft., Bottom: 8107 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13087 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 202, Top: 7807 ft., Bottom: 13087 ft.

Wellbore Completed
Completion Date:1/12/2015
Spud Date:12/31/2014Spud Date Is:ACTUAL
Measured TD:12991 ft.Measured PB depth:12972 ft.
True Vertical TD:7526 ft.True Vertical PB depth:7526 ft.
Top PZ Location:Sec:9 Twp: 2N 67WFootage: 902 FSL  142 FWL
Bottom Hole Location:Sec:4 Twp: 2N 67WFootage: 450 FSL  139 FWL
Log Types:CBL, MWD, (CDL/CNL/DIL in API 123-27346).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 113 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 113 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 863 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 361, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 9166 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 739, Top: 670 ft., Bottom: 8166 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12991 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 6151 ft., Bottom: 12991 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7396 ft.
NIOBRARA7509 ft.
FORT HAYS8000 ft.
CODELL8124 ft.

Formation CODL                     Formation Classification:  OW                     Status:  SI - 12/1/2023                 Interval Top: 8171 ft.    Interval Bottom: 12884 ft.

 Completed Information for Formation CODELL
1st Production Date:7/24/2015Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/12/2015Treatment End Date:6/17/2015
Treatment Summary:Stage 1 to 32 treated with total of 64257 bbl fluid, 50331 bbl fresh water plus 283 bbl additives and 2853220 lb of 40/70 sand.
Total fluid used in treatment (bbls):64257Max pressure during treatment (psi):7894
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):13619Total flowback volume recovered (bbls):530
Fresh water used in treatment (bbls):50614Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2853220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7355 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/3/2015Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 77
BBLS_OIL 97
BTU_GAS 1298
CALC_BBLS_H2O 77
CALC_BBLS_OIL 97
CALC_GOR 1330
CALC_MCF_GAS 128
CASING_PRESS 1695
GRAVITY_OIL 50
MCF_GAS 129
TUBING_PRESS 1082
Perforation Data:
Interval Top:8171 ft.# Of Holes:864
Interval Bottom:12884 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
07/16/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/07/2025
Defined Inactive (SI)YLast Production
11/30/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No