Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40171
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:SUMMIT #13C-32HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:438866LocationID:438862
County:WELD #123Location:SWSW 29 2N65W 6
Field:WATTENBERG - #90750Elevation:4943 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:395FSL  1031 FWLLat/Long: 40.103320 / -104.693465Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.103321 / -104.693466Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/19/2015
End Date: 3/21/2015
Reported: 5/11/2015
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 12950 ft.    Vertical TD: 7326 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:9/12/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 65W Footage: 1 FNL  1200 FWL
Bottom Hole Location:Sec:32 Twp: 2N 65W Footage: 1 FSL  1200 FWL
Proposed Depth/Form:12985 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 430, Top: 0 ft., Bottom: 1118 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7663 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 810, Top: 0 ft., Bottom: 7663 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6663 ft., Depth: 12985 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/2/2014
Spud Date:9/27/2014Spud Date Is:ACTUAL
Measured TD:12950 ft.Measured PB depth:12925 ft.
True Vertical TD:7326 ft.True Vertical PB depth:7327 ft.
Top PZ Location:Sec:32 Twp: 2N 65WFootage: 73 FNL  1217 FWL
Bottom Hole Location:Sec:32 Twp: 2N 65WFootage: 26 FSL  1207 FWL
Log Types:CBL, GR, MUD, (RES in API# 05-123-40175)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 0 ft., Bottom: 1108 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7724 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 790, Top: 202 ft., Bottom: 7724 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6686 ft., Depth: 12932 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4503 ft.
SHARON SPRINGS6980 ft.
NIOBRARA7030 ft.
FORT HAYS7507 ft.
CODELL7600 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/13/2017                 Interval Top: 8439 ft.    Interval Bottom: 12950 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:CODELL 8439-10,663; 10,805-12,950
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8439 ft.# Of Holes:
Interval Bottom:12950 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 12/1/2022                 Interval Top: 7774 ft.    Interval Bottom: 12950 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/16/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/19/2015Treatment End Date:4/21/2015
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 7774-12, 950. 12 BBL ACID, 147,499 BBL SLICKWATER, - 147,511 BBL TOTAL FLUID 4,665,900# 40/70 GENOA/SAND HILLS, - 4,665,900# TOTAL SAND." ENTERED FT. HAYS 7636-8438; 10,664-10,804 CODELL 8439-10,663; 10,805-12,950 SEE ATTACHMENT THIS IS A DESIGNATED SOURCE OF SUPPLY WELL
Total fluid used in treatment (bbls):147511Max pressure during treatment (psi):7316
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):6790Total flowback volume recovered (bbls):4235
Fresh water used in treatment (bbls):140709Disposition method For flowback:RECYCLE
Total proppant used (lbs):4665900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 56
BTU_GAS 1405
CALC_BBLS_OIL 56
CALC_GOR 1107
CALC_MCF_GAS 62
CASING_PRESS 2000
GRAVITY_OIL 50
MCF_GAS 62
Perforation Data:
Interval Top:7774 ft.# Of Holes:0
Interval Bottom:12950 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/13/2017                 Interval Top: 7636 ft.    Interval Bottom: 10804 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:1/13/2017Treatment End Date:N/A
Treatment Summary:FT. HAYS 7636-8438; 10,664-10,804
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7636 ft.# Of Holes:
Interval Bottom:10804 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3290
Total Gas Produced (MCF)47363
GOR14396
GOR DeterminationBOE
Average BOE per Day31.417
Average MCFE per Day182.205

 Federal Financial Assurance  i 

 Tribal Well  i No