|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2017 Measured TD: 11270 ft. Vertical TD: 5862 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/30/2018 | | Proposed Top PZ Location: | Sec:24 Twp: 10N 58W | Footage: 109 FSL 2356 FEL | | Bottom Hole Location: | Sec:24 Twp: 10N 58W | Footage: 100 FNL 2310 FEL | | Proposed Depth/Form: | 11265 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-646 , Unit Acreage: 1280, Drill Unit: All S25, All S24 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 632, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11265 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1788, Top: 0 ft., Bottom: 11265 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/5/2017 | | Spud Date: | 3/2/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 11270 ft. | Measured PB depth: | 11222 ft. | | True Vertical TD: | 5862 ft. | True Vertical PB depth: | 5863 ft. | | Top PZ Location: | Sec:24 Twp: 10N 58W | Footage: 110 FSL 2233 FEL | | Bottom Hole Location: | Sec:24 Twp: 10N 58W | Footage: 100 FNL 2312 FEL | | Log Types: | Mud Log, MWD/LWD, CBL (DEN, IND, GR, Triple Combo in API 123-39119) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 75 , Citings Type: ACTUAL | | Cement: | Sacks: 153, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2045 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 615, Top: 0 ft., Bottom: 2045 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11265 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1935, Top: 1340 ft., Bottom: 11270 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1448 ft. | | N | N | | HYGIENE | 3270 ft. | | N | N | | SUSSEX | 3747 ft. | | N | N | | SHARON SPRINGS | 5527 ft. | | N | N | | NIOBRARA | 5532 ft. | | N | N | | FORT HAYS | 5819 ft. | | N | N | | CODELL | 5856 ft. | | N | N | | CARLILE | 5866 ft. | | N | N |
Formation CARL Formation Classification: OW Status: CM - 6/6/2018 Interval Top: 6340 ft. Interval Bottom: 10725 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6340'-6734' (130 shots); 7898'-7966' (30 shots); 9224'-9226' (10 shots); 10646'-10725' (30 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 6340 ft. | # Of Holes: | 200 | | Interval Bottom: | 10725 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 6/6/2018 Interval Top: 6237 ft. Interval Bottom: 11180 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6237'-6305' (30 shots); 6765'-7860' (340 shots); 7990'-9192' (360 shots); 9262'-9362' (40 shots); 9725'-10614' (250 shots); 10761'-11180' (119 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6237 ft. | # Of Holes: | 1139 | | Interval Bottom: | 11180 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: PR - 11/15/2017 Interval Top: 6175 ft. Interval Bottom: 11180 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 10/6/2017 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/31/2017 | Treatment End Date: | 9/4/2017 | | Treatment Summary: | 35 Stage Plug & Perf, 700000# 100 Mesh , 2817500# 40/70 Prem White sand, 12 bbls 15% HCl, 134455 bbls slickwater | | Total fluid used in treatment (bbls): | 134467 | Max pressure during treatment (psi): | 7960 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 35 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 11141 | | Fresh water used in treatment (bbls): | 134455 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3517500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 3 in. | Tubing Setting Depth: | 5821 ft. | | Tubing Packer Depth: | 5812 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2017 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 219 | | BBLS_OIL | 216 | | BTU_GAS | 1449 | | CALC_BBLS_H2O | 219 | | CALC_BBLS_OIL | 216 | | CALC_GOR | 236 | | CALC_MCF_GAS | 51 | | GRAVITY_OIL | 35 | | MCF_GAS | 51 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 6175 ft. | # Of Holes: | 1399 | | Interval Bottom: | 11180 ft. | Hole Size: | 0.375 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 6/6/2018 Interval Top: 6175 ft. Interval Bottom: 9692 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/6/2018 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 6175'-6206' (20 shots); 9585'-9692' (40 shots) | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 6175 ft. | # Of Holes: | 60 | | Interval Bottom: | 9692 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1436 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 3.808 |
| Average MCFE per Day | 22.084 |
| Federal Financial Assurance | i | |
|
|