Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39789
Well Classification: OW Status: PR - 7/1/2018
Well Name/No:JZM #29N-E3HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2018
FacilityID:437947LocationID:437948
Municipality/County:FORT LUPTON / WELD #123Location:SESW 10 1N67W 6
Field:WATTENBERG - #90750Elevation:5076 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:287FSL  1580 FWLLat/Long: 40.059062 / -104.880674Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059061 / -104.880674Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/20/2017
End Date: 8/4/2017
Reported: 9/12/2017
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2018             Measured TD: 17570 ft.    Vertical TD: 7611 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/15/2018
Proposed Top PZ Location:Sec:10 Twp: 1N 67W Footage: 972 FSL  1442 FWL
Bottom Hole Location:Sec:3 Twp: 1N 67W Footage: 50 FNL  1490 FWL
Proposed Depth/Form:17617 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 680, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7985 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 900, Top: 0 ft., Bottom: 7985 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6884 ft., Depth: 17617 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 700, Top: , Bottom: 17617 ft.

Wellbore Completed
Completion Date:1/5/2017
Spud Date:12/24/2016Spud Date Is:ACTUAL
Measured TD:17570 ft.Measured PB depth:17464 ft.
True Vertical TD:7611 ft.True Vertical PB depth:7613 ft.
Top PZ Location:Sec:10 Twp: 1N 67WFootage: 859 FSL  1431 FWL
Bottom Hole Location:Sec:3 Twp: 1N 67WFootage: 73 FNL  1498 FWL
Log Types:CBL, MWD/GR, RESISTIVITY
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2267 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 857, Top: 0 ft., Bottom: 2267 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17558 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2405, Top: 772 ft., Bottom: 17558 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4642 ft.
SHARON SPRINGS7355 ft.
NIOBRARA7402 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2018                  Interval Top: 7850 ft.    Interval Bottom: 17372 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/12/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/20/2017Treatment End Date:8/4/2017
Treatment Summary:"PERF AND FRAC FROM 7850-17,372. 700 BBL 7.5% HCL ACID, 12,091 BBL PUMP DOWN, 258,783 BBL SLICKWATER, - 271,574 TOTAL FLUID 868,514# 100 MESH OTTAWA/ST. PETERS, 7,015,457# 40/70 OTTAWA/ST. PETERS, - 7,883,971# TOTAL SAND."
Total fluid used in treatment (bbls):271574Max pressure during treatment (psi):7574
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):700Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):32295Total flowback volume recovered (bbls):2898
Fresh water used in treatment (bbls):238579Disposition method For flowback:RECYCLE
Total proppant used (lbs):7883971Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 38
BBLS_OIL 193
BTU_GAS 1314
CALC_BBLS_H2O 38
CALC_BBLS_OIL 193
CALC_GOR 1777
CALC_MCF_GAS 343
CASING_PRESS 1500
GRAVITY_OIL 55
MCF_GAS 343
Perforation Data:
Interval Top:7850 ft.# Of Holes:867
Interval Bottom:17372 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2001
Total Gas Produced (MCF)99112
GOR49531
GOR DeterminationMCFE
Average BOE per Day52.595
Average MCFE per Day305.009

 Federal Financial Assurance  i 

 Tribal Well  i No