Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39780
Well Classification: OW Status: PR - 6/4/2015
Well Name/No:Newnam #2I-32H C264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2015
FacilityID:437932LocationID:437930
County:WELD #123Location:NENW 32 2N64W 6
Field:WATTENBERG - #90750Elevation:4968 ft.
Planned Location:308FNL  1627 FWLLat/Long: 40.101466 / -104.578423Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101466 / -104.578423Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/29/2015
End Date: 4/1/2015
Reported: 5/11/2015
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/4/2015             Measured TD: 11625 ft.    Vertical TD: 7140 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/4/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/1/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 64W Footage: 611 FNL  1771 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64W Footage: 460 FSL  1825 FWL
Proposed Depth/Form:11765 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7512 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 918, Top: 500 ft., Bottom: 7512 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11764 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 375, Top: 7212 ft., Bottom: 11764 ft.

Wellbore Completed
Completion Date:1/18/2015
Spud Date:1/9/2015Spud Date Is:ACTUAL
Measured TD:11625 ft.Measured PB depth:11601 ft.
True Vertical TD:7140 ft.True Vertical PB depth:7140 ft.
Top PZ Location:Sec:32 Twp: 2N 64WFootage: 633 FNL  1754 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64WFootage: 535 S  1879 W
Log Types:CBL/MWD/GR/(NEU, DENS run in API: 123-21516)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 137 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 137 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1031 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 419, Top: 0 ft., Bottom: 1044 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7465 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 1590 ft., Bottom: 7483 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11605 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 401, Top: 5582 ft., Bottom: 11625 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6836 ft.
NIOBRARA6875 ft.
FORT HAYS7335 ft.
CODELL7533 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/4/2018                  Interval Top: 9248 ft.    Interval Bottom: 10082 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/30/2015Treatment End Date:3/31/2015
Treatment Summary:Stages 11 - 16 treated with 10,671 bbls of fresh water, 53 bbls of recycled water, 59 bbls of additives, 27 bbls of acid 15%, and 589,042 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):10810Max pressure during treatment (psi):8274
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):27Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):53Total flowback volume recovered (bbls):53
Fresh water used in treatment (bbls):10730Disposition method For flowback:DISPOSAL
Total proppant used (lbs):589042Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9248 ft.# Of Holes:160
Interval Bottom:10082 ft.Hole Size:0.375 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/4/2018                  Interval Top: 8075 ft.    Interval Bottom: 11553 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/27/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/28/2015Treatment End Date:3/31/2015
Treatment Summary:Stages 1 - 10, & 17 - 24 treated with 32,014 of fresh water, 158 bbls of recycled water, 177 bbls of additives, 80 bbls of acid 15%, and 1,767,126 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):32429Max pressure during treatment (psi):8704
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):80Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):158Total flowback volume recovered (bbls):158
Fresh water used in treatment (bbls):32191Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1767126Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8075 ft.# Of Holes:486
Interval Bottom:11553 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/4/2018                  Interval Top: 7488 ft.    Interval Bottom: 8028 ft.

 Completed Information for Formation CODELL
1st Production Date:5/27/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/1/2015Treatment End Date:4/1/2015
Treatment Summary:Stages 25 - 28 treated with 7,154 of fresh water, 35 bbls of recycled water, 39 bbls of additives, 18 bbls of acid 15%, and 392,695 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):7206Max pressure during treatment (psi):7668
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):35Total flowback volume recovered (bbls):35
Fresh water used in treatment (bbls):7154Disposition method For flowback:DISPOSAL
Total proppant used (lbs):392695Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7488 ft.# Of Holes:108
Interval Bottom:8028 ft.Hole Size:0.375 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 6/4/2015                  Interval Top: 7488 ft.    Interval Bottom: 11553 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/28/2015Treatment End Date:4/1/2015
Treatment Summary:Stages 1 - 28 treated with 49,799 bbls of fresh water, 245 bbls of recycled water, 276 bbls of additives, 125 bbls of acid 15%, and 2,748,863 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):50445Max pressure during treatment (psi):8704
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):125Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):245Total flowback volume recovered (bbls):245
Fresh water used in treatment (bbls):50075Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2748863Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7202 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2015Test Method:FLOWS FROM WELL
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 191
BBLS_OIL 84
BTU_GAS 1298
CALC_BBLS_H2O 191
CALC_BBLS_OIL 84
CALC_GOR 1607
CALC_MCF_GAS 135
CASING_PRESS 1843
GRAVITY_OIL 50
MCF_GAS 135
TUBING_PRESS 990
Perforation Data:
Interval Top:7488 ft.# Of Holes:754
Interval Bottom:11553 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)799
Total Gas Produced (MCF)4898
GOR6130
GOR DeterminationBOE
Average BOE per Day4.495
Average MCFE per Day26.047

 Federal Financial Assurance  i 

 Tribal Well  i No