Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39774
Well Classification: OW Status: PR - 6/4/2015
Well Name/No:Newnam #2C-32H C264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/4/2015
FacilityID:437925LocationID:437930
County:WELD #123Location:NENW 32 2N64W 6
Field:WATTENBERG - #90750Elevation:4966 ft.
Planned Location:308FNL  1567 FWLLat/Long: 40.101468 / -104.578637Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.101468 / -104.578638Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/15/2015
End Date: 3/19/2015
Reported: 5/11/2015
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/4/2015             Measured TD: 11625 ft.    Vertical TD: 7138 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/4/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/1/2016
Proposed Top PZ Location:Sec:32 Twp: 2N 64W Footage: 610 FNL  478 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64W Footage: 460 FSL  485 FWL
Proposed Depth/Form:11865 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7620 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 933, Top: 500 ft., Bottom: 7620 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11864 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 375, Top: 7320 ft., Bottom: 11864 ft.

Wellbore Completed
Completion Date:11/15/2014
Spud Date:11/6/2014Spud Date Is:ACTUAL
Measured TD:11625 ft.Measured PB depth:11586 ft.
True Vertical TD:7138 ft.True Vertical PB depth:7138 ft.
Top PZ Location:Sec:32 Twp: 2N 64WFootage: 884 FNL  508 FWL
Bottom Hole Location:Sec:32 Twp: 2N 64WFootage: 569 S  485 W
Log Types:Resitivity/GR/MWD/(NEU, DENS run in API: 123-21516)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 137 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 137 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1019 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 419, Top: 0 ft., Bottom: 1032 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7756 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 0 ft., Bottom: 7771 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11590 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 5705 ft., Bottom: 11625 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6994 ft.
NIOBRARA7032 ft.
FORT HAYS7498 ft.
CODELL7594 ft.
CARLILE7771 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/2/2018                  Interval Top: 9970 ft.    Interval Bottom: 10362 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/16/2015Treatment End Date:3/17/2015
Treatment Summary:Stages 9 - 11 treated with 5,450 bbls of fresh water, 86 bbls of recycled water, 27 bbls of additives, 21 bbls of acid 15%, and 292,319 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):5584Max pressure during treatment (psi):8088
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):21Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):86Total flowback volume recovered (bbls):30
Fresh water used in treatment (bbls):5477Disposition method For flowback:DISPOSAL
Total proppant used (lbs):292319Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9970 ft.# Of Holes:81
Interval Bottom:10362 ft.Hole Size:0.375 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/2/2018                  Interval Top: 8506 ft.    Interval Bottom: 11387 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:5/27/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/15/2015Treatment End Date:3/18/2015
Treatment Summary:Stages 2 - 8, 12 - 14, & 20 - 21 treated with 21,908 of fresh water, 344 bbls of recycled water, 109 bbls of additives, 83 bbls of acid 15%, and 1,169,275 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):22334Max pressure during treatment (psi):8733
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):344Total flowback volume recovered (bbls):120
Fresh water used in treatment (bbls):21908Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1169275Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8506 ft.# Of Holes:324
Interval Bottom:11387 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/2/2018                  Interval Top: 8067 ft.    Interval Bottom: 11538 ft.

 Completed Information for Formation CODELL
1st Production Date:5/24/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/13/2015Treatment End Date:3/18/2015
Treatment Summary:Stages 1, 15 - 19, & 22 - 24 treated with 16,431 of fresh water, 258 bbls of recycled water, 82 bbls of additives, 62 bbls of acid 15%, and 876,957 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):16751Max pressure during treatment (psi):7861
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):62Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):258Total flowback volume recovered (bbls):90
Fresh water used in treatment (bbls):16431Disposition method For flowback:DISPOSAL
Total proppant used (lbs):876957Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8067 ft.# Of Holes:243
Interval Bottom:11538 ft.Hole Size:0.375 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/2/2018                  Interval Top: 7774 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation CARLILE
1st Production Date:5/27/2015Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2015Treatment End Date:3/19/2015
Treatment Summary:Stages 25 - 26 treated with 3,651 bbls of fresh water, 57 bbls of recycled water, 18 bbls of additives, 14 bbls of acid 15%, and 194,879 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):3722Max pressure during treatment (psi):8265
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):14Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):57Total flowback volume recovered (bbls):20
Fresh water used in treatment (bbls):3651Disposition method For flowback:DISPOSAL
Total proppant used (lbs):194879Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7774 ft.# Of Holes:54
Interval Bottom:8020 ft.Hole Size:0.375 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 6/4/2015                  Interval Top: 7774 ft.    Interval Bottom: 11538 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:5/27/2015Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/13/2015Treatment End Date:3/19/2015
Treatment Summary:Stages 1 - 26 treated with 47,231 bbls of fresh water, 745 bbls of recycled water, 236 bbls of additives, 179 bbls of acid 15%, and 2,533,430 lbs of 40/70 Sand Proppant
Total fluid used in treatment (bbls):48391Max pressure during treatment (psi):8733
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):179Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):745Total flowback volume recovered (bbls):260
Fresh water used in treatment (bbls):47467Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2533430Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7298 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2015Test Method:flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 168
BBLS_OIL 74
BTU_GAS 1298
CALC_BBLS_H2O 168
CALC_BBLS_OIL 74
CALC_GOR 1487
CALC_MCF_GAS 110
CASING_PRESS 1675
GRAVITY_OIL 50
MCF_GAS 110
TUBING_PRESS 801
Perforation Data:
Interval Top:7774 ft.# Of Holes:702
Interval Bottom:11538 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1205
Total Gas Produced (MCF)7891
GOR6548
GOR DeterminationBOE
Average BOE per Day7.015
Average MCFE per Day40.687

 Federal Financial Assurance  i 

 Tribal Well  i No