Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39725
Well Classification: OW Status: SI - 9/1/2024
Well Name/No:Dale #4H-20H-O264
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2024
FacilityID:437838LocationID:437845
County:WELD #123Location:SWSE 20 2N64W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Planned Location:337FSL  1754 FELLat/Long: 40.117641 / -104.571833Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117641 / -104.571834Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/21/2014
End Date: 12/27/2014
Reported: 2/24/2015
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2024             Measured TD: 11733 ft.    Vertical TD: 7168 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/27/2016
Proposed Top PZ Location:Sec:20 Twp: 2N 64W Footage: 615 FSL  943 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64W Footage: 490 FNL  888 FEL
Proposed Depth/Form:11801 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30# , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7565 ft., Weight: 26# , Citings Type: PLANNED
Cement:Sacks: 925, Top: 500 ft., Bottom: 7565 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11801 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 374, Top: 7265 ft., Bottom: 11801 ft.

Wellbore Completed
Completion Date:9/28/2014
Spud Date:8/19/2014Spud Date Is:ACTUAL
Measured TD:11733 ft.Measured PB depth:11717 ft.
True Vertical TD:7168 ft.True Vertical PB depth:7168 ft.
Top PZ Location:Sec:20 Twp: 2N 64WFootage: 615 FSL  943 FEL
Bottom Hole Location:Sec:20 Twp: 2N 64WFootage: 490 N  888 E
Log Types:CBL, MWD, (Resistivity 123-39723)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 143 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 143 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1104 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 1104 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7548 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 592, Top: 0 ft., Bottom: 7548 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11733 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 352, Top: 6190 ft., Bottom: 11733 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6875 ft.
NIOBRARA6929 ft.
FORT HAYS7429 ft.
CODELL7657 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/28/2016                Interval Top: 7657 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 1-5: Top=10822 Bottom=11733 Stages 17-28: Top=7657 Bottom=9219
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 9/1/2024                  Interval Top: 7429 ft.    Interval Bottom: 11733 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:3/8/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/21/2014Treatment End Date:12/27/2014
Treatment Summary:Stages 1-28 treated with 68,031 bbls of fresh water, 257 bbls Hybrid (Gel & Slickwater), 245 bbls of HCL 15%, 189,129 lbs of 30/50 and 2,611,038 lbs of 40/70 sand proppant
Total fluid used in treatment (bbls):68533Max pressure during treatment (psi):8225
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):245Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):950
Fresh water used in treatment (bbls):68288Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2800167Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/15/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 242
BBLS_OIL 309
BTU_GAS 1298
CALC_BBLS_H2O 242
CALC_BBLS_OIL 309
CALC_GOR 1074
CALC_MCF_GAS 332
CASING_PRESS 1743
GRAVITY_OIL 50
MCF_GAS 332
TUBING_PRESS 1428
Perforation Data:
Interval Top:7429 ft.# Of Holes:729
Interval Bottom:11733 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/28/2016                Interval Top: 7429 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/28/2016Treatment End Date:N/A
Treatment Summary:Stages 6-16: Top=9219 Bottom=10970 Stage 28: Top= 7429 Bottom=7657
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1471
Total Gas Produced (MCF)6988
GOR4750
GOR DeterminationBOE
Average BOE per Day7.287
Average MCFE per Day42.259

 Federal Financial Assurance  i 

 Tribal Well  i No