Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39631
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Jillson-East Rinn #3E-22H-M268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:437650LocationID:434171
County:WELD #123Location:SWSW 22 2N68W 6
Field:WATTENBERG - #90750Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:374FSL  711 FWLLat/Long: 40.117907 / -104.996242Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117907 / -104.996241Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/19/2014
End Date: 12/9/2014
Reported: 1/5/2015
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 15166 ft.    Vertical TD: 7516 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/19/2016
Proposed Top PZ Location:Sec:22 Twp: 2N 68W Footage: 613 FSL  1031 FWL
Bottom Hole Location:Sec:15 Twp: 2N 68W Footage: 2657 FSL  950 FWL
Proposed Depth/Form:15306 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7938 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 500 ft., Bottom: 7938 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15306 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 292, Top: 7638 ft., Bottom: 15306 ft.

Wellbore Completed
Completion Date:8/11/2014
Spud Date:7/30/2014Spud Date Is:ACTUAL
Measured TD:15166 ft.Measured PB depth:15148 ft.
True Vertical TD:7516 ft.True Vertical PB depth:7517 ft.
Top PZ Location:Sec:22 Twp: 2n 68wFootage: 843 FSL  1027 FWL
Bottom Hole Location:Sec:15 Twp: 2n 68wFootage: 2542 FSL  967 FWL
Log Types:CBL/MWD/(IND run in API:123-23027)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 30 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 888 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 351, Top: 0 ft., Bottom: 902 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7990 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 705, Top: 0 ft., Bottom: 7990 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15150 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 665, Top: 4576 ft., Bottom: 15150 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7238 ft.
NIOBRARA7340 ft.
FORT HAYS7788 ft.
CODELL7869 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/7/2017                 Interval Top: 8315 ft.    Interval Bottom: 8414 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/30/2015Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/19/2014Treatment End Date:12/8/2014
Treatment Summary:Stage 2 is in the Carlile. Stage 2 treated with 2007 bbl fresh water plus 8 bbl additives. 99,742 lb of 40/70 sand proppant.
Total fluid used in treatment (bbls):2015Max pressure during treatment (psi):7738
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):50
Fresh water used in treatment (bbls):2015Disposition method For flowback:DISPOSAL
Total proppant used (lbs):99742Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8315 ft.# Of Holes:27
Interval Bottom:8414 ft.Hole Size:0.375 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/7/2017                 Interval Top: 8160 ft.    Interval Bottom: 15099 ft.

 Completed Information for Formation CODELL
1st Production Date:1/30/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/19/2014Treatment End Date:12/8/2014
Treatment Summary:Stages 1 and 3-47 treated with 92344 bbl fresh water plus 483 bbl additives. 4,575,373 lb of 40/70 sand proppant.
Total fluid used in treatment (bbls):92827Max pressure during treatment (psi):8378
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2012
Fresh water used in treatment (bbls):92827Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4588148Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8160 ft.# Of Holes:1213
Interval Bottom:15099 ft.Hole Size:0.375 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 9/1/2024                  Interval Top: 8016 ft.    Interval Bottom: 15099 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:1/30/2015Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/19/2014Treatment End Date:12/8/2014
Treatment Summary:47 Stage Stimulation: 94842 bbl fluid, 4675115 lb of 40/70 proppant
Total fluid used in treatment (bbls):94842Max pressure during treatment (psi):8378
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2062
Fresh water used in treatment (bbls):94842Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4675115Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7608 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2015Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BBLS_OIL 167
BTU_GAS 1298
CALC_BBLS_H2O 53
CALC_BBLS_OIL 167
CALC_GOR 1144
CALC_MCF_GAS 191
CASING_PRESS 2263
GRAVITY_OIL 50
MCF_GAS 191
TUBING_PRESS 1234
Perforation Data:
Interval Top:8016 ft.# Of Holes:1240
Interval Bottom:15099 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)94
Total Gas Produced (MCF)1118
GOR11893
GOR DeterminationBOE
Average BOE per Day3.272
Average MCFE per Day18.984

 Federal Financial Assurance  i 

 Tribal Well  i No