|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/3/2023 Measured TD: 15137 ft. Vertical TD: 7602 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/3/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 5/14/2016 | | Proposed Top PZ Location: | Sec:11 Twp: 1N 68W | Footage: 2205 FSL 285 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 50 FSL 285 FEL | | Proposed Depth/Form: | 15327 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 1161 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7958 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 840, Top: 0 ft., Bottom: 7958 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6920 ft., Depth: 15327 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 1/8/2015 | | Spud Date: | 10/25/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15137 ft. | Measured PB depth: | 15083 ft. | | True Vertical TD: | 7602 ft. | True Vertical PB depth: | 7603 ft. | | Top PZ Location: | Sec:11 Twp: 1N 68W | Footage: 1946 FSL 275 FEL | | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 53 FSL 277 FEL | | Log Types: | CBL, GR, MUD, CNL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1339 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 535, Top: 0 ft., Bottom: 1339 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 8028 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 699, Top: 1800 ft., Bottom: 8028 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7002 ft., Depth: 15133 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 7002 ft., Bottom: 15133 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4628 ft. | | | | | SHARON SPRINGS | 7563 ft. | | | | | NIOBRARA | 7631 ft. | | | |
Formation NBRR Formation Classification: OW Status: AB - 10/3/2023 Interval Top: 8051 ft. Interval Bottom: 15061 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/22/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/4/2015 | Treatment End Date: | 12/11/2015 | | Treatment Summary: | "PERF AND FRAC FROM 8051-15,061.
452 BBL ACID, 191,896 BBL SLICKWATER, 7,857 BBL WATER, - 200,205 BBL TOTAL FLUID
6,012,796# 40/70 GENOA/SAND HILLS, - 6,012,796# TOTAL SAND."
| | Total fluid used in treatment (bbls): | 200205 | Max pressure during treatment (psi): | 7669 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 36 | | Total acid used in treatment (bbls): | 452 | Min frac gradient (psi/ft): | 0.81 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8824 | | Fresh water used in treatment (bbls): | 199753 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6012796 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/30/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 73 | | BBLS_OIL | 312 | | BTU_GAS | 1391 | | CALC_BBLS_H2O | 73 | | CALC_BBLS_OIL | 312 | | CALC_GOR | 1529 | | CALC_MCF_GAS | 477 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 48 | | MCF_GAS | 477 |
| | Perforation Data: | | Interval Top: | 8051 ft. | # Of Holes: | 864 | | Interval Bottom: | 15061 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/03/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|