Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39427
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:SACK #2C-30HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:437163LocationID:437161
County:WELD #123Location:SWSE 31 1N67W 6
Field:WATTENBERG - #90750Elevation:5041 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:880FSL  1889 FELLat/Long: 40.002755 / -104.930446Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.002757 / -104.930444Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/14/2015
End Date: 3/24/2015
Reported: 5/19/2015
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 17262 ft.    Vertical TD: 7778 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/14/2016
Proposed Top PZ Location:Sec:31 Twp: 1N 67W Footage: 1498 FSL  1978 FEL
Bottom Hole Location:Sec:30 Twp: 1N 67W Footage: 25 FNL  1840 FEL
Proposed Depth/Form:17304 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 360, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1265 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 480, Top: 0 ft., Bottom: 1265 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8184 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8184 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7181 ft., Depth: 17304 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:11/12/2014
Spud Date:7/28/2014Spud Date Is:ACTUAL
Measured TD:17262 ft.Measured PB depth:17205 ft.
True Vertical TD:7778 ft.True Vertical PB depth:7779 ft.
Top PZ Location:Sec:31 Twp: 1N 67WFootage: 1498 FSL  1978 FEL
Bottom Hole Location:Sec:30 Twp: 1N 67WFootage: 25 FNL  1840 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1334 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 1334 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8206 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 30 ft., Bottom: 8206 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7146 ft., Depth: 17251 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 7146 ft., Bottom: 17251 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX5058 ft.
SHARON SPRINGS7365 ft.
NIOBRARA7395 ft.
FORT HAYS8010 ft.
CODELL8106 ft.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 3/1/2025                  Interval Top: 8220 ft.    Interval Bottom: 17133 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:4/23/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/14/2015Treatment End Date:3/24/2015
Treatment Summary:"PERF AND FRAC FROM 8220-17,133. 36 BBL ACID, 163,939 BBL SLICKWATER, 9,315 BBL WATER, - 173,289 BBL TOTAL FLUID 4,981,790# 40/70 GENOA/SAND HILLS, - 4,981,790# TOTAL SAND." ENTERED FT HAYS 8007-8099; 8350-8880 CODELL 8100-8349; 8881-17,133 THIS IS A DESIGNATED SOURCE OF SUPPLY WELL; (SEE ATTACHMENT)
Total fluid used in treatment (bbls):173289Max pressure during treatment (psi):7736
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2170
Fresh water used in treatment (bbls):173253Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4981790Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2015Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 180
BTU_GAS 1344
CALC_BBLS_OIL 180
CALC_GOR 2083
CALC_MCF_GAS 375
CASING_PRESS 680
GRAVITY_OIL 46
MCF_GAS 375
Perforation Data:
Interval Top:8220 ft.# Of Holes:1038
Interval Bottom:17133 ft.Hole Size:0.37 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/13/2016                Interval Top: 8100 ft.    Interval Bottom: 17133 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/13/2016Treatment End Date:N/A
Treatment Summary:CODELL 8100-8349; 8881-17,133
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8100 ft.# Of Holes:1038
Interval Bottom:17133 ft.Hole Size:0.37 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/13/2016                Interval Top: 8007 ft.    Interval Bottom: 8880 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/13/2016Treatment End Date:N/A
Treatment Summary:ENTERED FT HAYS 8007-8099; 8350-8880
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8007 ft.# Of Holes:1038
Interval Bottom:8880 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)219
Total Gas Produced (MCF)7942
GOR36264
GOR DeterminationMCFE
Average BOE per Day4.336
Average MCFE per Day25.155

 Federal Financial Assurance  i 

 Tribal Well  i No