Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39421
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Wolf #12L-0103
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FUNDARE RESOURCES OPERATING COMPANY LLC - 10773
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:437152LocationID:437154
County:WELD #123Location:SWNW 12 10N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4953 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2558FNL  619 FWLLat/Long: 40.852931 / -103.934714Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.852931 / -103.934653Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2014
End Date: 10/10/2014
Reported: 10/22/2014
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 12/23/2014             Measured TD: 6700 ft.    Vertical TD: 6604 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 12/23/2014
Wellbore PermitDirectional
Permit #: Expiration Date:5/14/2016
Proposed Depth/Form:6550 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 28 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 776, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1750 ft., Depth: 6550 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/25/2014
Spud Date:8/24/2014Spud Date Is:ACTUAL
Measured TD:6700 ft.Measured PB depth:5461 ft.
True Vertical TD:6604 ft.True Vertical PB depth:5366 ft.
Bottom Hole Location:Sec:12 Twp: 10N 59WFootage: 2308 FSL  1308 FWL
Log Types:Triple Combo, Den-Neu, Induction, Microlog logs,MWD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1793 ft., Weight: 36.00 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 1793 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1793 ft., Depth: 6700 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 5461 ft., Depth: 5461 ft., Bottom: 6700 ft., Sacks: 600, Method:
FormationInterval TopLog BottomCoredDSTs
HYGIENE3634 ft.NN
SHARON SPRINGS6029 ft.NN
NIOBRARA6036 ft.ZN
FORT HAYS6352 ft.ZY
CODELL6392 ft.ZN
CARLILE6406 ft.ZN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 13393 ft.    Vertical TD: 5992 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/14/2016
Proposed Top PZ Location:Sec:12 Twp: 10N 59W Footage: 1846 FNL  1004 FWL
Bottom Hole Location:Sec:1 Twp: 10N 59W Footage: 600 FNL  825 FWL
Proposed Depth/Form:12943 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-60 , Unit Acreage: 960, Drill Unit: N/2 S12, All S1
Casing:String Type: CONDUCTOR, Hole Size: 28 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 776, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6446 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 432, Top: 0 ft., Bottom: 6446 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5663 ft., Depth: 12943 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 502, Top: 5663 ft., Bottom: 12943 ft.

Wellbore Completed
Completion Date:9/17/2014
Spud Date:8/24/2014Spud Date Is:ACTUAL
Measured TD:13393 ft.Measured PB depth:13342 ft.
True Vertical TD:5992 ft.True Vertical PB depth:5992 ft.
Top PZ Location:Sec:12 Twp: 10N 59WFootage: 2150 FNL  1182 FWL
Bottom Hole Location:Sec:1 Twp: 10N 59WFootage: 609 FNL  779 FWL
Log Types:MWD, Mud, CBL, Caliper, Microlog, Induction, Spectral Gamma Ray,Triple Combo
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 109 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1793 ft., Weight: 36.00 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 1793 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6629 ft., Weight: 29.00 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 2136 ft., Bottom: 6629 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5307 ft., Depth: 13383 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 5307 ft., Bottom: 13383 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6036 ft.ZN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2024                  Interval Top: 6660 ft.    Interval Bottom: 13268 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/25/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/3/2014Treatment End Date:10/10/2014
Treatment Summary:Cemented liner: 40 stage 22# pHaserFrac XL Gel 79061 bbl; 22# Linear Gel 13856 bbl; Slickwater 25545 bbl; 15% HCl 429 bb; fresh water 6252 bbl. Total Proppant: 6163966# 20/40 White Sand; 118216# 40/70 White Sand
Total fluid used in treatment (bbls):125143Max pressure during treatment (psi):7970
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):429Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):118462Total flowback volume recovered (bbls):27157
Fresh water used in treatment (bbls):6252Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6282180Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5400 ft.
Tubing Packer Depth:5400 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/19/2014Test Method:Separator
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 684
BBLS_OIL 193
BTU_GAS 1532
CALC_BBLS_H2O 684
CALC_BBLS_OIL 193
CALC_GOR 67
CALC_MCF_GAS 13
CASING_PRESS 75
GRAVITY_OIL 32
MCF_GAS 13
TUBING_PRESS 175
Perforation Data:
Interval Top:6660 ft.# Of Holes:1440
Interval Bottom:13268 ft.Hole Size:0.4285714 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)427
Total Gas Produced (MCF)3131
GOR7332
GOR DeterminationBOE
Average BOE per Day2.666
Average MCFE per Day15.442

 Federal Financial Assurance  i 

 Tribal Well  i No