|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2025 Measured TD: 12241 ft. Vertical TD: 7119 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/22/2016 | | Proposed Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 1709 FSL 460 FWL | | Bottom Hole Location: | Sec:11 Twp: 3N 68W | Footage: 1714 FSL 470 FEL | | Proposed Depth/Form: | 12273 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-833 , Unit Acreage: 640, Drill Unit: ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 61, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1025 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 426, Top: 0 ft., Bottom: 1025 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 23 ft., Depth: 7931 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 725, Top: 725 ft., Bottom: 6931 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7193 ft., Depth: 12273 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 10/17/2014 | | Spud Date: | 8/19/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12241 ft. | Measured PB depth: | 12189 ft. | | True Vertical TD: | 7119 ft. | True Vertical PB depth: | 7119 ft. | | Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 1712 FSL 574 FWL | | Bottom Hole Location: | Sec:11 Twp: 3N 68W | Footage: 1722 FSL 472 FEL | | Log Types: | CBL, gamma ray | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1058 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1058 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7955 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 112 ft., Bottom: 7955 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7023 ft., Depth: 12236 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7023 ft., Bottom: 12236 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3616 ft. | 3949 ft. | N | N | | SUSSEX | 4113 ft. | 4281 ft. | N | N | | SHANNON | 4614 ft. | 4743 ft. | N | N | | SHARON SPRINGS | 7352 ft. | 7591 ft. | N | N | | NIOBRARA | 7592 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2025 Interval Top: 8004 ft. Interval Bottom: 12104 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/10/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/26/2014 | Treatment End Date: | 12/9/2014 | | Treatment Summary: | Total fluid: 77161 bbl. Total proppant: 4104851 lbs; 1,870,852 Premium White 20/40, 255,700 Premium White 40/70, 1,570,478 premium white 30/50, 407,821 CRC 20/40. | | Total fluid used in treatment (bbls): | 77161 | Max pressure during treatment (psi): | 8890 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 667 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 20054 | | Fresh water used in treatment (bbls): | 76494 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4104851 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7122 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/15/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 172 | | BBLS_OIL | 492 | | BTU_GAS | 1286 | | CALC_BBLS_H2O | 172 | | CALC_BBLS_OIL | 492 | | CALC_GOR | 990 | | CALC_MCF_GAS | 485 | | CASING_PRESS | 1469 | | GRAVITY_OIL | 44 | | MCF_GAS | 485 | | TUBING_PRESS | 1347 |
| | Perforation Data: | | Interval Top: | 8004 ft. | # Of Holes: | 840 | | Interval Bottom: | 12104 ft. | Hole Size: | 0.4285714 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 790 |
| Total Gas Produced (MCF) | 48997 |
| GOR | 62021 |
| GOR Determination | MCFE |
| Average BOE per Day | 25.127 |
| Average MCFE per Day | 145.714 |
| Federal Financial Assurance | i | |
|
|