|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2026 Measured TD: 13210 ft. Vertical TD: 7552 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2026 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/13/2016 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 611 FSL 1560 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 350 FSL 1800 FEL | | Proposed Depth/Form: | 13132 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 859 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 362, Top: 0 ft., Bottom: 859 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13132 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 2556, Top: 0 ft., Bottom: 13132 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13132 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 202, Top: 7832 ft., Bottom: 13132 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/13/2015 | | Spud Date: | 3/21/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 13210 ft. | Measured PB depth: | 13185 ft. | | True Vertical TD: | 7552 ft. | True Vertical PB depth: | 7554 ft. | | Top PZ Location: | Sec:9 Twp: 2N 67W | Footage: 460 FSL 1593 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 228 FSL 1792 FEL | | Log Types: | MWD/CBL/(CDL, CNL, DIL run in API: 123-27346) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 863 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 362, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13187 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 2236, Top: 360 ft., Bottom: 13187 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7527 ft. | | | | | NIOBRARA | 7614 ft. | | | | | FORT HAYS | 7904 ft. | | | | | CODELL | 7948 ft. | | | | | CARLILE | 7994 ft. | | | |
Formation CODL Formation Classification: OW Status: SI - 1/1/2026 Interval Top: 8170 ft. Interval Bottom: 13086 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/24/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/7/2015 | Treatment End Date: | 6/11/2015 | | Treatment Summary: | Stage 1 to 34 treated with total of 57701 bbl fluid, 53902 bbl fresh water plus 241 bbl additives and 2885222 lb of 40/70 sand.
Fresh water and additives are totaled as the Fresh Water used in treatment. | | Total fluid used in treatment (bbls): | 57701 | Max pressure during treatment (psi): | 7932 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 34 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.00 | | Recycled water used in treatment (bbls): | 3558 | Total flowback volume recovered (bbls): | 2200 | | Fresh water used in treatment (bbls): | 54143 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2885222 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7888 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/3/2015 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 77 | | BBLS_OIL | 96 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 77 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 2448 | | CALC_MCF_GAS | 235 | | CASING_PRESS | 1915 | | GRAVITY_OIL | 50 | | MCF_GAS | 235 | | TUBING_PRESS | 648 |
| | Perforation Data: | | Interval Top: | 8170 ft. | # Of Holes: | 835 | | Interval Bottom: | 13086 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 842 |
| Total Gas Produced (MCF) | 4273 |
| GOR | 5074 |
| GOR Determination | BOE |
| Average BOE per Day | 4.309 |
| Average MCFE per Day | 24.983 |
| Federal Financial Assurance | i | |
|
|