|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2025 Measured TD: 17444 ft. Vertical TD: 7806 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/12/2016 | | Proposed Top PZ Location: | Sec:31 Twp: 1N 67W | Footage: 1406 FSL 1374 FWL | | Bottom Hole Location: | Sec:30 Twp: 1N 67W | Footage: 1 FNL 1390 FWL | | Proposed Depth/Form: | 17441 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 1161 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8251 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 870, Top: 0 ft., Bottom: 8251 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7246 ft., Depth: 17441 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 12/18/2014 | | Spud Date: | 8/17/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 17444 ft. | Measured PB depth: | 17390 ft. | | True Vertical TD: | 7806 ft. | True Vertical PB depth: | 7807 ft. | | Top PZ Location: | Sec:31 Twp: 1N 67W | Footage: 1381 FSL 1337 FWL | | Bottom Hole Location: | Sec:30 Twp: 1N 67W | Footage: 2 FNL 1381 FWL | | Log Types: | CBL, GR, MUD, (IND in API# 05-123-09845) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1308 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 1308 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8230 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 33 ft., Bottom: 8230 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7220 ft., Depth: 17439 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 680, Top: 7220 ft., Bottom: 17439 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5084 ft. | | | | | SHARON SPRINGS | 7447 ft. | | | | | NIOBRARA | 7483 ft. | | | | | FORT HAYS | 8066 ft. | | | | | CODELL | 8193 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 1/20/2017 Interval Top: 11585 ft. Interval Bottom: 12224 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/20/2017 | Treatment End Date: | N/A | | Treatment Summary: | Carlile: 11,585-12,224
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 11585 ft. | # Of Holes: | 728 | | Interval Bottom: | 12224 ft. | Hole Size: | 0.37 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 1/20/2017 Interval Top: 9171 ft. Interval Bottom: 15352 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/20/2017 | Treatment End Date: | N/A | | Treatment Summary: | Entered Ft Hays: 9,171-9,274; 11,430-11,585; 14,553-15,352
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9171 ft. | # Of Holes: | 728 | | Interval Bottom: | 15352 ft. | Hole Size: | 0.37 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 9/1/2025 Interval Top: 8255 ft. Interval Bottom: 17316 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 3/22/2015 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 2/27/2015 | Treatment End Date: | 3/12/2015 | | Treatment Summary: | "PERF AND FRAC FROM 8255-17,316.
119 BBL ACID, 171,298 BBL SLICKWATER, 10,214 BBL WATER, - 181,631 BBL TOTAL FLUID
5,426,000# 40/70 GENOA/SAND HILLS, - 5,426,000# TOTAL SAND."
Entered Ft Hays: 9,171-9,274; 11,430-11,585; 14,553-15,352
Carlile: 11,585-12,224
Codell: 8,196-9,171; 9,275-11,429; 12,225-14,553; 15,353-17,444
This is a Designated Source of Supply well
(See Attachment)
| | Total fluid used in treatment (bbls): | 181631 | Max pressure during treatment (psi): | 7469 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 31 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 704 | | Fresh water used in treatment (bbls): | 181512 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5426000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2015 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 332 | | BBLS_OIL | 148 | | BTU_GAS | 1168 | | CALC_BBLS_H2O | 332 | | CALC_BBLS_OIL | 148 | | CALC_GOR | 1622 | | CALC_MCF_GAS | 240 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 50 | | MCF_GAS | 240 |
| | Perforation Data: | | Interval Top: | 8255 ft. | # Of Holes: | 728 | | Interval Bottom: | 17316 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/20/2017 Interval Top: 8196 ft. Interval Bottom: 17444 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/20/2017 | Treatment End Date: | N/A | | Treatment Summary: | Codell: 8,196-9,171; 9,275-11,429; 12,225-14,553; 15,353-17,444 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8196 ft. | # Of Holes: | 728 | | Interval Bottom: | 17444 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 415 |
| Total Gas Produced (MCF) | 15756 |
| GOR | 37966 |
| GOR Determination | MCFE |
| Average BOE per Day | 8.695 |
| Average MCFE per Day | 50.429 |
| Federal Financial Assurance | i | |
|
|