Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39241
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Woolley Becky #2C-7H-E168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:436731LocationID:305447
County:WELD #123Location:SWNW 7 1N68W 6
Field:WATTENBERG - #90750Elevation:4994 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2242FNL  574 FWLLat/Long: 40.066854 / -105.053416Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.066854 / -105.053416Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/17/2017
End Date: 7/7/2017
Reported: 11/15/2017
Originally Reported: 11/13/2017
Days to report: 131
Days to report: 129
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 14539 ft.    Vertical TD: 7660 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2018
Proposed Top PZ Location:Sec:7 Twp: 1N 68W Footage: 2100 FNL  900 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68W Footage: 974 FNL  813 FWL
Proposed Depth/Form:14633 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1753 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1753 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15016 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2300, Top: , Bottom: 15016 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14633 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 261, Top: 7777 ft., Bottom: 14633 ft.

Wellbore Completed
Completion Date:12/20/2016
Spud Date:10/31/2016Spud Date Is:ACTUAL
Measured TD:14539 ft.Measured PB depth:14463 ft.
True Vertical TD:7660 ft.True Vertical PB depth:7662 ft.
Top PZ Location:Sec:7 Twp: 1N 68WFootage: 2100 FNL  900 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 974 FNL  813 FWL
Log Types:MWD, Mud, CBL, (Triple Combo in 123-38111)
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1779 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 1779 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14514 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1788, Top: 0 ft., Bottom: 14514 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4479 ft.NN
SHANNON5052 ft.NN
TEEPEE BUTTES6587 ft.NN
SHARON SPRINGS7387 ft.NN
NIOBRARA7445 ft.NN
FORT HAYS8122 ft.NN
CODELL13713 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/3/2018                 Interval Top: 13713 ft.    Interval Bottom: 14417 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2018Treatment End Date:N/A
Treatment Summary:Perfs: 13713-14417
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:13713 ft.# Of Holes:540
Interval Bottom:14417 ft.Hole Size:0.41 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/3/2018                 Interval Top: 8122 ft.    Interval Bottom: 13712 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2018Treatment End Date:N/A
Treatment Summary:Perfs: 8122-13712
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8122 ft.# Of Holes:540
Interval Bottom:13712 ft.Hole Size:0.41 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 1/7/2019                  Interval Top: 8102 ft.    Interval Bottom: 14417 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:6/17/2017Treatment End Date:7/7/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/7/2017Treatment End Date:7/7/2017
Treatment Summary:150869 bbl water, 129 bbl additives (FRP-4K, ACI-97 and ASF-67) and 24 bbl HCl in a 24 stage frac with 3865980 lb of silica quartz proppant
Total fluid used in treatment (bbls):151022Max pressure during treatment (psi):7996
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10231
Fresh water used in treatment (bbls):150998Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3865980Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 283
BBLS_OIL 33
BTU_GAS 1298
CALC_BBLS_H2O 283
CALC_BBLS_OIL 33
CALC_GOR 4485
CALC_MCF_GAS 148
CASING_PRESS 2100
GRAVITY_OIL 50
MCF_GAS 148
Perforation Data:
Interval Top:8102 ft.# Of Holes:540
Interval Bottom:14417 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/3/2018                 Interval Top: 8102 ft.    Interval Bottom: 8121 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2018Treatment End Date:N/A
Treatment Summary:Perfs: 8101-8121
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8102 ft.# Of Holes:540
Interval Bottom:8121 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3439
Total Gas Produced (MCF)66010
GOR19194
GOR DeterminationMCFE
Average BOE per Day40.598
Average MCFE per Day235.453

 Federal Financial Assurance  i 

 Tribal Well  i No