Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-39091
Well Classification: OW Status: PR - 10/1/2023
Well Name/No:NRC #1C-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2023
FacilityID:436386LocationID:436390
County:WELD #123Location:SESE 8 1N67W 6
Field:WATTENBERG - #90750Elevation:5074 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:350FSL  860 FELLat/Long: 40.059248 / -104.908166Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.059253 / -104.908170Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/5/2014
End Date: 9/6/2014
Reported: 10/17/2014
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2023             Measured TD: 12897 ft.    Vertical TD: 7754 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/10/2016
Proposed Top PZ Location:Sec:8 Twp: 1N 67W Footage: 1 FSL  525 FEL
Bottom Hole Location:Sec:8 Twp: 1N 67W Footage: 460 FNL  525 FEL
Proposed Depth/Form:12978 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1161 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 440, Top: 0 ft., Bottom: 1161 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8160 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8160 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7068 ft., Depth: 12978 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/29/2014
Spud Date:3/31/2014Spud Date Is:ACTUAL
Measured TD:12897 ft.Measured PB depth:12897 ft.
True Vertical TD:7754 ft.True Vertical PB depth:7754 ft.
Top PZ Location:Sec:8 Twp: 1N 67WFootage: 138 FSL  273 FEL
Bottom Hole Location:Sec:8 Twp: 1N 67WFootage: 482 FNL  310 FEL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1242 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 442, Top: 0 ft., Bottom: 1242 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8113 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 822, Top: 66 ft., Bottom: 8113 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7156 ft., Depth: 12882 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4771 ft.
SHARON SPRINGS7455 ft.
NIOBRARA7510 ft.
FORT HAYS7921 ft.
CODELL7972 ft.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 10/1/2023                 Interval Top: 8157 ft.    Interval Bottom: 12897 ft.

 Completed Information for Formation CODELL
1st Production Date:9/26/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2014Treatment End Date:9/6/2014
Treatment Summary:"COMPLETED THROUGH AN OPEN HOLE LINER FROM 8157-12,897. 6,147 BBL CROSSLINK GEL, 854 BBL LINEAR GEL, 82,211 BBL SLICKWATER, - 89,212 BBL TOTAL FLUID 2,073,385# 100 MESH UNSPECIFIED, 179,031# 30/50 OTTAWA/ST. PETERS, - 2,252,416# TOTAL SAND."
Total fluid used in treatment (bbls):89212Max pressure during treatment (psi):7566
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):4032Total flowback volume recovered (bbls):1041
Fresh water used in treatment (bbls):85180Disposition method For flowback:RECYCLE
Total proppant used (lbs):2252416Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 190
BBLS_OIL 302
BTU_GAS 1258
CALC_BBLS_H2O 190
CALC_BBLS_OIL 302
CALC_GOR 1139
CALC_MCF_GAS 344
CASING_PRESS 1320
GRAVITY_OIL 51
MCF_GAS 344
Perforation Data:
Interval Top:8157 ft.# Of Holes:0
Interval Bottom:12897 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1156
Total Gas Produced (MCF)33931
GOR29352
GOR DeterminationMCFE
Average BOE per Day19.201
Average MCFE per Day111.366

 Federal Financial Assurance  i 

 Tribal Well  i No