Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38929
Well Classification: OW Status: SI - 10/1/2023
Well Name/No:Schmunk EF #31-362HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2023
FacilityID:436107LocationID:309903
County:WELD #123Location:NWNE 31 7N65W 6
Field:WATTENBERG - #90750Elevation:4853 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:527FNL  1884 FELLat/Long: 40.537464 / -104.703486Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.537462 / -104.703487Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/4/2015
End Date: 2/13/2015
Reported: 6/19/2015
Originally Reported: 4/6/2015
Days to report: 126
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2023             Measured TD: 12094 ft.    Vertical TD: 7177 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/12/2016
Proposed Top PZ Location:Sec:31 Twp: 7N 65W Footage: 460 FNL  470 FEL
Bottom Hole Location:Sec:31 Twp: 7N 65W Footage: 470 FSL  470 FEL
Proposed Depth/Form:12095 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 61, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1025 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 426, Top: 0 ft., Bottom: 1025 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7740 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 725 ft., Bottom: 7740 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6963 ft., Depth: 12096 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:12/3/2014
Spud Date:8/31/2014Spud Date Is:ACTUAL
Measured TD:12094 ft.Measured PB depth:12042 ft.
True Vertical TD:7177 ft.True Vertical PB depth:7176 ft.
Top PZ Location:Sec:31 Twp: 7N 65WFootage: 554 FNL  485 FEL
Bottom Hole Location:Sec:31 Twp: 7N 65WFootage: 480 FSL  478 FEL
Log Types:MWD/LWD, Mud Log, CBL (Triple Combo 123-38938)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 152, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1055 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 1055 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7791 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 723, Top: 242 ft., Bottom: 7791 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7092 ft., Depth: 12089 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 7092 ft., Bottom: 12089 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PARKMAN3831 ft.4187 ft.NN
SUSSEX4363 ft.4703 ft.NN
SHANNON5042 ft.5189 ft.NN
SHARON SPRINGS7260 ft.NN
NIOBRARA7350 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 10/1/2023                 Interval Top: 7839 ft.    Interval Bottom: 11969 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/4/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/4/2015Treatment End Date:2/13/2015
Treatment Summary:666 bbls 15% HCL Acid; 279,840 # 40/70 Sand; 3,640,080 # 20/40 Sand; 280,000 # CRC 20/40; 80,465 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):81131Max pressure during treatment (psi):4876
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):666Min frac gradient (psi/ft):0.11
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):12935
Fresh water used in treatment (bbls):80465Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4199920Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7503 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/8/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 504
BBLS_OIL 481
BTU_GAS 1282
CALC_BBLS_H2O 504
CALC_BBLS_OIL 481
CALC_GOR 609
CALC_MCF_GAS 293
CASING_PRESS 1225
GRAVITY_OIL 42
MCF_GAS 293
TUBING_PRESS 686
Perforation Data:
Interval Top:7839 ft.# Of Holes:840
Interval Bottom:11969 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
01/29/2025
Defined Inactive (SI)YLast Production
09/30/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No