Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38865
Well Classification: OW Status: PR - 4/11/2022
Well Name/No:SENECA E #15-72-1HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/11/2022
FacilityID:435931LocationID:435930
County:WELD #123Location:SWSW 14 6N65W 6
Field:WATTENBERG - #90750Elevation:4738 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:315FSL  530 FWLLat/Long: 40.479670 / -104.638160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.479669 / -104.638184Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/29/2014
End Date: 8/29/2014
Reported: 10/10/2014
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/11/2022             Measured TD: 11710 ft.    Vertical TD: 7096 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/11/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/20/2016
Proposed Top PZ Location:Sec:15 Twp: 6N 65W Footage: 858 FSL  341 FEL
Bottom Hole Location:Sec:15 Twp: 6N 65W Footage: 533 FNL  342 FEL
Proposed Depth/Form:11670 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 590 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 590 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7637 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 510, Top: , Bottom: 7637 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7387 ft., Depth: 11670 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/5/2014
Spud Date:5/28/2014Spud Date Is:ACTUAL
Measured TD:11710 ft.Measured PB depth:11694 ft.
True Vertical TD:7096 ft.True Vertical PB depth:7096 ft.
Top PZ Location:Sec:15 Twp: 6N 65WFootage: 858 FSL  341 FEL
Bottom Hole Location:Sec:15 Twp: 6N 65WFootage: 533 FNL  342 FEL
Log Types:CBL, MUD, GR
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 96 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 48, Top: 0 ft., Bottom: 96 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 638 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 366, Top: 0 ft., Bottom: 638 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7568 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 627, Top: 883 ft., Bottom: 7568 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7459 ft., Depth: 11695 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE984 ft.
PARKMAN3654 ft.
SUSSEX4219 ft.
SHANNON5028 ft.
TEEPEE BUTTES6120 ft.
NIOBRARA6878 ft.
CODELL7586 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/11/2022                 Interval Top: 10816 ft.    Interval Bottom: 11294 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/21/2014Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 10816'-11294'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10816 ft.# Of Holes:0
Interval Bottom:11294 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/11/2022                 Interval Top: 8837 ft.    Interval Bottom: 8927 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/21/2014Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 8837'-8927'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8837 ft.# Of Holes:0
Interval Bottom:8927 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/11/2022                 Interval Top: 7705 ft.    Interval Bottom: 11294 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/21/2014Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CLCDFH.
Perforation Data:
Interval Top:7705 ft.# Of Holes:21
Interval Bottom:11294 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/11/2022                 Interval Top: 7705 ft.    Interval Bottom: 11626 ft.

 Completed Information for Formation CODELL
1st Production Date:9/21/2014Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/11/2022Treatment End Date:N/A
Treatment Summary:Intervals: 7705'-8836', 8928'-10815', 11295'-11626'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2014Treatment End Date:8/29/2014
Treatment Summary:FRAC'D W/3380209 GALS SILVERSTIM AND SLICK WATER AND 3297178# OTTAWA SAND
Total fluid used in treatment (bbls):80481Max pressure during treatment (psi):7039
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):3577Total flowback volume recovered (bbls):2499
Fresh water used in treatment (bbls):76904Disposition method For flowback:RECYCLE
Total proppant used (lbs):3297178Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 524
BBLS_OIL 246
BTU_GAS 1280
CALC_BBLS_H2O 524
CALC_BBLS_OIL 246
CALC_GOR 1398
CALC_MCF_GAS 344
CASING_PRESS 2180
GRAVITY_OIL 41
MCF_GAS 344
TUBING_PRESS 1160
Perforation Data:
Interval Top:7705 ft.# Of Holes:0
Interval Bottom:11626 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3083
Total Gas Produced (MCF)43031
GOR13957
GOR DeterminationBOE
Average BOE per Day28.713
Average MCFE per Day166.532

 Federal Financial Assurance  i 

 Tribal Well  i No