Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38856
Well Classification: OW Status: PR - 11/1/2020
Well Name/No:BROOK #LC28-77-1HNA
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/1/2020
FacilityID:435921LocationID:422406
County:WELD #123Location:SESW 28 9N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4853 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:340FSL  1506 FWLLat/Long: 40.714990 / -103.986960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.715013 / -103.986960Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/3/2014
End Date: 11/5/2014
Reported: 12/18/2014
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 2/17/2015             Measured TD: 6410 ft.    Vertical TD: 6014 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 2/17/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/19/2016
Proposed Top PZ Location:Sec:28 Twp: 9N 59W Footage: 765 FSL  1649 FWL
Bottom Hole Location:Sec:28 Twp: 9N 59W Footage: 675 FNL  1650 FWL
Proposed Depth/Form:10157 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: S.20,28,&29:All
Casing:String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6404 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 440, Top: , Bottom: 6404 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6254 ft., Depth: 10302 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/3/2014
Spud Date:9/3/2014Spud Date Is:ACTUAL
Measured TD:6410 ft.Measured PB depth:5025 ft.
True Vertical TD:6014 ft.True Vertical PB depth:5001 ft.
Bottom Hole Location:Sec:28 Twp: 9N 59WFootage: 765 FSL  1649 FWL
Log Types:Mud/Gamma
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 636 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 364, Top: 0 ft., Bottom: 636 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 636 ft., Depth: 6410 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 5675 ft., Depth: 5675 ft., Bottom: 6275 ft., Sacks: 166, Method:
Additional Cement:String Type: OPEN HOLE , Top: 5025 ft., Depth: 5025 ft., Bottom: 5675 ft., Sacks: 289, Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2514 ft.
PARKMAN3419 ft.
SUSSEX4205 ft.
SHANNON4509 ft.
NIOBRARA6089 ft.
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 11/1/2020             Measured TD: 10411 ft.    Vertical TD: 6034 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 11/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/8/2016
Proposed Top PZ Location:Sec:28 Twp: 9N 59W Footage: 765 FSL  1649 FWL
Bottom Hole Location:Sec:28 Twp: 9N 59W Footage: 675 FNL  1650 FWL
Proposed Depth/Form:10302 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: S.20,28&29: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 636 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 0 ft., Bottom: 636 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6404 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 440, Top: , Bottom: 6404 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6254 ft., Depth: 10302 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/13/2014
Spud Date:9/3/2014Spud Date Is:ACTUAL
Measured TD:10411 ft.Measured PB depth:10363 ft.
True Vertical TD:6034 ft.True Vertical PB depth:6035 ft.
Top PZ Location:Sec:28 Twp: 9N 59WFootage: 695 FSL  1575 FWL
Bottom Hole Location:Sec:28 Twp: 9N 59WFootage: 677 FNL  1653 FWL
Log Types:CBL/Mud/Gamma
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 636 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 364, Top: 0 ft., Bottom: 636 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6400 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 947 ft., Bottom: 6400 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6259 ft., Depth: 10407 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 6259 ft., Bottom: 10407 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PIERRE2514 ft.
PARKMAN3419 ft.
SUSSEX4205 ft.
SHANNON4509 ft.
NIOBRARA6089 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/1/2020                 Interval Top: 6488 ft.    Interval Bottom: 10236 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2014Treatment End Date:11/5/2014
Treatment Summary:Frac'd the Niobrara w/ 2550340 gals of Silverstim and Slick Water 7.5% HCL with 3381370#' of Ottawa sand.
Total fluid used in treatment (bbls):60734Max pressure during treatment (psi):6762
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):3740Total flowback volume recovered (bbls):224
Fresh water used in treatment (bbls):56981Disposition method For flowback:RECYCLE
Total proppant used (lbs):3381370Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6097 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/12/2014Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 431
BBLS_OIL 208
BTU_GAS 1291
CALC_BBLS_H2O 431
CALC_BBLS_OIL 208
CALC_GOR 514
CALC_MCF_GAS 107
CASING_PRESS 929
GRAVITY_OIL 41
MCF_GAS 107
TUBING_PRESS 219
Perforation Data:
Interval Top:6488 ft.# Of Holes:456
Interval Bottom:10236 ft.Hole Size:0.74 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)928
Total Gas Produced (MCF)7325
GOR7893
GOR DeterminationBOE
Average BOE per Day5.968
Average MCFE per Day34.608

 Federal Financial Assurance  i 

 Tribal Well  i No