|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2020 Measured TD: 10424 ft. Vertical TD: 6121 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/19/2016 | | Proposed Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 765 FSL 655 FWL | | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 675 FNL 660 FWL | | Proposed Depth/Form: | 9929 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: S.20,28,&29:All | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6529 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 440, Top: , Bottom: 6529 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6379 ft., Depth: 10415 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/21/2014 | | Spud Date: | 8/14/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 10424 ft. | Measured PB depth: | 10424 ft. | | True Vertical TD: | 6121 ft. | True Vertical PB depth: | 6121 ft. | | Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 931 FSL 647 FWL | | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 675 FNL 660 FWL | | Log Types: | CBL/Mud/Gamma | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 618 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 336, Top: 0 ft., Bottom: 618 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6594 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 325 ft., Bottom: 6594 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6451 ft., Depth: 10414 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2521 ft. | | | | | PARKMAN | 3465 ft. | | | | | SUSSEX | 4244 ft. | | | | | SHANNON | 4566 ft. | | | | | NIOBRARA | 6226 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2020 Interval Top: 6721 ft. Interval Bottom: 10336 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/9/2014 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/7/2014 | Treatment End Date: | 11/8/2014 | | Treatment Summary: | Frac'd 19 Stages of the Niobrara w/ 2473741 gals of Silverstim and Slick Water with 3394420#'s of Ottawa sand. | | Total fluid used in treatment (bbls): | 58898 | Max pressure during treatment (psi): | 6181 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | 3699 | Total flowback volume recovered (bbls): | 928 | | Fresh water used in treatment (bbls): | 55199 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3394420 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6464 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/12/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 432 | | BBLS_OIL | 298 | | BTU_GAS | 1291 | | CALC_BBLS_H2O | 432 | | CALC_BBLS_OIL | 298 | | CALC_GOR | 412 | | CALC_MCF_GAS | 123 | | CASING_PRESS | 929 | | GRAVITY_OIL | 41 | | MCF_GAS | 123 | | TUBING_PRESS | 262 |
| | Perforation Data: | | Interval Top: | 6721 ft. | # Of Holes: | 0 | | Interval Bottom: | 10336 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 681 |
| Total Gas Produced (MCF) | 6793 |
| GOR | 9975 |
| GOR Determination | BOE |
| Average BOE per Day | 5.042 |
| Average MCFE per Day | 29.218 |
| Federal Financial Assurance | i | |
|
|