|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2020 Measured TD: 10332 ft. Vertical TD: 5990 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/15/2015 | Prop Depth/Form: | 10154 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-376 , Unit Acreage: 1920, Drill Unit: Sec. 20,28, & 29:ALL | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 0 ft., Bottom: 550 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6365 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: , Bottom: 6365 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6215 ft., Depth: 10154 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/18/2014 | Spud Date: | 7/11/2014 | Spud Date Is: | ACTUAL | Measured TD: | 10332 ft. | Measured PB depth: | 10323 ft. | True Vertical TD: | 5990 ft. | True Vertical PB depth: | 5990 ft. | Top PZ Location: | Sec:28 Twp: 9N 59W | Footage: 799 FSL 969 FEL | Depth | Bottom Hole Location: | Sec:28 Twp: 9N 59W | Footage: 676 FNL 993 FEL | Depth | Log Types: | CBL, Mud, MWD/LWD | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 657 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 323, Top: 0 ft., Bottom: 657 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6380 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 1325 ft., Bottom: 6380 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6163 ft., Depth: 10325 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2496 ft. | | | | PARKMAN | 3399 ft. | | | | SUSSEX | 4039 ft. | | | | SHANNON | 4431 ft. | | | | NIOBRARA | 6177 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/1/2020 Interval Top: 6441 ft. Interval Bottom: 10181 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/21/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/9/2014 | Treatment End Date: | 10/14/2014 | Treatment Summary: | Frac'd the Niobrara w/ 3450808 gals of Silverstim and Slick Water with 2544440#'s of Ottawa sand.
Perf 6441-10185 | Total fluid used in treatment (bbls): | 82162 | Max pressure during treatment (psi): | 6402 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 19 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 2755 | Total flowback volume recovered (bbls): | 206 | Fresh water used in treatment (bbls): | 79406 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2544440 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6115 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/28/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 747 | BBLS_OIL | 374 | BTU_GAS | 1291 | CALC_BBLS_H2O | 747 | CALC_BBLS_OIL | 374 | CALC_GOR | 358 | CALC_MCF_GAS | 134 | CASING_PRESS | 1018 | GRAVITY_OIL | 41 | MCF_GAS | 134 | TUBING_PRESS | 698 |
| Perforation Data: | Interval Top: | 6441 ft. | # Of Holes: | 456 | Interval Bottom: | 10181 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1767 |
Total Gas Produced (MCF) | 18609 |
GOR | 10531 |
GOR Determination | BOE |
Average BOE per Day | 13.605 |
Average MCFE per Day | 78.913 |
Federal Financial Assurance | i | |
|
|