|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2025 Measured TD: 16787 ft. Vertical TD: 6977 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/28/2015 | | Proposed Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 1140 FSL 614 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 1159 FSL 512 FWL | | Proposed Depth/Form: | 11686 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 398, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7392 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 699, Top: 3000 ft., Bottom: 7392 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7192 ft., Depth: 16856 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/22/2014 | | Spud Date: | 8/15/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 16787 ft. | Measured PB depth: | 16777 ft. | | True Vertical TD: | 6977 ft. | True Vertical PB depth: | 6976 ft. | | Top PZ Location: | Sec:22 Twp: 6N 67W | Footage: 1140 FSL 614 FEL | | Bottom Hole Location: | Sec:21 Twp: 6N 67W | Footage: 1159 FSL 512 FWL | | Log Types: | CBL, Mudlog, GR | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 785 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 785 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7416 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 744, Top: 680 ft., Bottom: 7416 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7191 ft., Depth: 16783 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 712, Top: 7191 ft., Bottom: 16783 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3507 ft. | | N | N | | SUSSEX | 4294 ft. | | N | N | | SHANNON | 4590 ft. | | N | N | | SHARON SPRINGS | 6895 ft. | | N | N | | NIOBRARA | 6955 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: SI - 3/1/2025 Interval Top: 7524 ft. Interval Bottom: 16722 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/29/2015 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/12/2015 | Treatment End Date: | 7/15/2015 | | Treatment Summary: | 26 stage plug and perf (7524'-11231', 936 holes); 49,845 bbls of fluid, 5,001,463 lbs of sand used. | | Total fluid used in treatment (bbls): | 49845 | Max pressure during treatment (psi): | 8557 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.31 | | Type Of gas: | | Number Of staged intervals: | 26 | | Total acid used in treatment (bbls): | 311 | Min frac gradient (psi/ft): | 1.00 | | Recycled water used in treatment (bbls): | 10865 | Total flowback volume recovered (bbls): | 521 | | Fresh water used in treatment (bbls): | 38669 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 5001463 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/28/2015 | Treatment End Date: | 5/7/2015 | | Treatment Summary: | 38 stage plug and perf (11278'-16722', 1332 holes); 93,408 bbl used; 7,601,009 lbs of proppant | | Total fluid used in treatment (bbls): | 93408 | Max pressure during treatment (psi): | 9341 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.31 | | Type Of gas: | | Number Of staged intervals: | 38 | | Total acid used in treatment (bbls): | 325 | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 20417 | Total flowback volume recovered (bbls): | 3485 | | Fresh water used in treatment (bbls): | 72666 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 7601009 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/29/2015 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 387 | | BBLS_OIL | 42 | | BTU_GAS | 53 | | CALC_BBLS_H2O | 387 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 976 | | CALC_MCF_GAS | 41 | | GRAVITY_OIL | 43 | | MCF_GAS | 41 |
| | Perforation Data: | | Interval Top: | 7524 ft. | # Of Holes: | 2268 | | Interval Bottom: | 16722 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 362 |
| Total Gas Produced (MCF) | 3589 |
| GOR | 9914 |
| GOR Determination | BOE |
| Average BOE per Day | 2.653 |
| Average MCFE per Day | 15.386 |
| Federal Financial Assurance | i | |
|
|