Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38303
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Guttersen #31T-441
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:434735LocationID:434585
County:WELD #123Location:SWSE 31 3N63W 6
Field:WATTENBERG - #90750Elevation:4823 ft.
Planned Location:75FSL  2119 FELLat/Long: 40.174870 / -104.478500Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174885 / -104.478471Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/5/2014
End Date: 11/10/2014
Reported: 2/21/2019
Days to report: 1564
Disclosure: Sidetrack #00
Start Date: 11/6/2014
End Date: 11/14/2014
Reported: 11/26/2014
Days to report: 12
Disclosure: Sidetrack #00
Start Date: 11/7/2014
End Date: 11/8/2014
Reported: 12/10/2014
Days to report: 32
Disclosure: Sidetrack #00
Start Date: 11/8/2014
End Date: 11/10/2014
Reported: 12/10/2014
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 11127 ft.    Vertical TD: 6824 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/16/2015
Proposed Top PZ Location:Sec:31 Twp: 3N 63W Footage: 734 FSL  1857 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63W Footage: 500 FNL  1849 FEL
Proposed Depth/Form:11229 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7376 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7376 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6068 ft., Depth: 11229 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:6/13/2014
Spud Date:6/4/2014Spud Date Is:ACTUAL
Measured TD:11127 ft.Measured PB depth:10909 ft.
True Vertical TD:6824 ft.True Vertical PB depth:6824 ft.
Top PZ Location:Sec:31 Twp: 3N 63WFootage: 737 FSL  1853 FEL
Bottom Hole Location:Sec:31 Twp: 3N 63WFootage: 500 N  1843 E
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7234 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 636, Top: 0 ft., Bottom: 7234 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6913 ft., Depth: 10913 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3598 ft.
SUSSEX4033 ft.
SHARON SPRINGS6436 ft.
NIOBRARA6553 ft.
FORT HAYS7064 ft.
CODELL7077 ft.
CARLILE7396 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/23/2019                 Interval Top: 7396 ft.    Interval Bottom: 9867 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/23/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,396'-7,832' 8,167'-9,867'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7396 ft.# Of Holes:
Interval Bottom:9867 ft.Hole Size:

Formation CD-CRL                 Formation Classification:  OW                 Status:  SI - 11/1/2024                 Interval Top: 7077 ft.    Interval Bottom: 11127 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:11/28/2014Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/5/2014Treatment End Date:11/10/2014
Treatment Summary:15 Stage Sliding Sleeve, Swell Packer set at 7,077' Total Fluid: 70,079 bbls Gel Fluid: 55,882 bbls Slickwater Fluid: 14,197 bbls Total Proppant: 3,615,260 lbs Silican Proppant: 3,615,260 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):70079Max pressure during treatment (psi):3889
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8255
Fresh water used in treatment (bbls):70079Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3615260Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6895 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/6/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 301
BBLS_OIL 244
BTU_GAS 1285
CALC_BBLS_H2O 301
CALC_BBLS_OIL 244
CALC_GOR 1078
CALC_MCF_GAS 263
CASING_PRESS 1277
GRAVITY_OIL 45
MCF_GAS 263
TUBING_PRESS 843
Perforation Data:
Interval Top:7077 ft.# Of Holes:
Interval Bottom:11127 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/23/2019                 Interval Top: 7077 ft.    Interval Bottom: 11127 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:4/23/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,077'-7,396' 7,832'-8,167' 9,867'-11,127'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7077 ft.# Of Holes:
Interval Bottom:11127 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day0.003
Average MCFE per Day0.016

 Federal Financial Assurance  i 

 Tribal Well  i No