|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 11127 ft. Vertical TD: 6824 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/16/2015 | Proposed Top PZ Location: | Sec:31 Twp: 3N 63W | Footage: 734 FSL 1857 FEL | Bottom Hole Location: | Sec:31 Twp: 3N 63W | Footage: 500 FNL 1849 FEL | Proposed Depth/Form: | 11229 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7376 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7376 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6068 ft., Depth: 11229 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 6/13/2014 | Spud Date: | 6/4/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11127 ft. | Measured PB depth: | 10909 ft. | True Vertical TD: | 6824 ft. | True Vertical PB depth: | 6824 ft. | Top PZ Location: | Sec:31 Twp: 3N 63W | Footage: 737 FSL 1853 FEL | Bottom Hole Location: | Sec:31 Twp: 3N 63W | Footage: 500 N 1843 E | Log Types: | CBL, MWD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 929 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 830, Top: 0 ft., Bottom: 929 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7234 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 636, Top: 0 ft., Bottom: 7234 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6913 ft., Depth: 10913 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3598 ft. | | | | SUSSEX | 4033 ft. | | | | SHARON SPRINGS | 6436 ft. | | | | NIOBRARA | 6553 ft. | | | | FORT HAYS | 7064 ft. | | | | CODELL | 7077 ft. | | | | CARLILE | 7396 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 4/23/2019 Interval Top: 7396 ft. Interval Bottom: 9867 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/23/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,396'-7,832' 8,167'-9,867' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 7396 ft. | # Of Holes: | | Interval Bottom: | 9867 ft. | Hole Size: | |
|
Formation CD-CRL Formation Classification: OW Status: SI - 11/1/2024 Interval Top: 7077 ft. Interval Bottom: 11127 ft. Completed Information for Formation CODELL-CARLILE | 1st Production Date: | 11/28/2014 | Choke Size: | | Formation Name: | CODELL-CARLILE | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/5/2014 | Treatment End Date: | 11/10/2014 | Treatment Summary: | 15 Stage Sliding Sleeve, Swell Packer set at 7,077'
Total Fluid: 70,079 bbls
Gel Fluid: 55,882 bbls
Slickwater Fluid: 14,197 bbls
Total Proppant: 3,615,260 lbs
Silican Proppant: 3,615,260 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 70079 | Max pressure during treatment (psi): | 3889 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 15 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 1.00 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8255 | Fresh water used in treatment (bbls): | 70079 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3615260 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6895 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/6/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 301 | BBLS_OIL | 244 | BTU_GAS | 1285 | CALC_BBLS_H2O | 301 | CALC_BBLS_OIL | 244 | CALC_GOR | 1078 | CALC_MCF_GAS | 263 | CASING_PRESS | 1277 | GRAVITY_OIL | 45 | MCF_GAS | 263 | TUBING_PRESS | 843 |
| Perforation Data: | Interval Top: | 7077 ft. | # Of Holes: | | Interval Bottom: | 11127 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 4/23/2019 Interval Top: 7077 ft. Interval Bottom: 11127 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 4/23/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,077'-7,396' 7,832'-8,167' 9,867'-11,127' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7077 ft. | # Of Holes: | | Interval Bottom: | 11127 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 1 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 0.003 |
Average MCFE per Day | 0.016 |
Federal Financial Assurance | i | |
|
|