|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2024 Measured TD: 11193 ft. Vertical TD: 6834 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/7/2015 | Proposed Top PZ Location: | Sec:6 Twp: 2N 63W | Footage: 734 FNL 2128 FEL | Bottom Hole Location: | Sec:6 Twp: 2N 63W | Footage: 500 FSL 2122 FEL | Proposed Depth/Form: | 11228 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 875 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7370 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 500 ft., Bottom: 7370 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6056 ft., Depth: 11228 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 7/19/2014 | Spud Date: | 7/8/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11193 ft. | Measured PB depth: | 11185 ft. | True Vertical TD: | 6834 ft. | True Vertical PB depth: | 6834 ft. | Top PZ Location: | Sec:6 Twp: 2N 63W | Footage: 784 FNL 2121 FEL | Bottom Hole Location: | Sec:6 Twp: 2N 63W | Footage: 502 S 2100 E | Log Types: | CBL, MWD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 888 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 740, Top: 0 ft., Bottom: 888 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7186 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 632, Top: 0 ft., Bottom: 7186 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7026 ft., Depth: 11189 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3670 ft. | | | | SUSSEX | 4123 ft. | | | | SHARON SPRINGS | 6328 ft. | | | | NIOBRARA | 6520 ft. | | | | FORT HAYS | 7232 ft. | | | | CODELL | 7901 ft. | | | | CARLILE | 9809 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 3/25/2019 Interval Top: 9809 ft. Interval Bottom: 11193 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 9,809'-11,193' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9809 ft. | # Of Holes: | | Interval Bottom: | 11193 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 3/25/2019 Interval Top: 7901 ft. Interval Bottom: 9291 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,901'-8,269' 8,357'-9,291' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7901 ft. | # Of Holes: | | Interval Bottom: | 9291 ft. | Hole Size: | |
|
Formation CLCDFH Formation Classification: OW Status: SI - 9/1/2024 Interval Top: 7232 ft. Interval Bottom: 11193 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 12/10/2014 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/21/2014 | Treatment End Date: | 11/22/2014 | Treatment Summary: | 16 Stage Sliding Sleeve, Swell Packer set at 7,232'
Total Fluid: 70,080 bbls
Gel Fluid: 56,384 bbls
Slickwater Fluid: 13,696 bbls
Total Proppant: 3,643,240 lbs
Silica Proppant: 3,643,240 lbs
Method for determining flowback: measuring flowback tank volumes. | Total fluid used in treatment (bbls): | 70080 | Max pressure during treatment (psi): | 4825 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 16 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.97 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 5397 | Fresh water used in treatment (bbls): | 70080 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3643240 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6863 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/21/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 170 | BBLS_OIL | 202 | BTU_GAS | 1291 | CALC_BBLS_H2O | 170 | CALC_BBLS_OIL | 202 | CALC_GOR | 960 | CALC_MCF_GAS | 194 | CASING_PRESS | 862 | GRAVITY_OIL | 43 | MCF_GAS | 194 | TUBING_PRESS | 461 |
| Perforation Data: | Interval Top: | 7232 ft. | # Of Holes: | | Interval Bottom: | 11193 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 3/25/2019 Interval Top: 7232 ft. Interval Bottom: 9809 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | | Treatment Date: | 3/25/2019 | Treatment End Date: | N/A | Treatment Summary: | Completed Depths: 7,232'-7,901' 8,269'-8,357' 9,291'-9,809' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7232 ft. | # Of Holes: | | Interval Bottom: | 9809 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1572 |
Total Gas Produced (MCF) | 7069 |
GOR | 4496 |
GOR Determination | BOE |
Average BOE per Day | 7.613 |
Average MCFE per Day | 44.130 |
Federal Financial Assurance | i | |
|
|