|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2021 Measured TD: 16778 ft. Vertical TD: 7749 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 10/4/2017 | Prop Depth/Form: | 16916 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2360 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 987, Top: 0 ft., Bottom: 2360 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 16730 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2602, Top: , Bottom: 16730 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 16916 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 335, Top: 8106 ft., Bottom: 16916 ft. |
| | |
Wellbore Completed | Completion Date: | 8/31/2017 | Spud Date: | 7/23/2017 | Spud Date Is: | ACTUAL | Measured TD: | 16778 ft. | Measured PB depth: | 16733 ft. | True Vertical TD: | 7749 ft. | True Vertical PB depth: | 7749 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 480 FSL 1485 FEL | Depth | Bottom Hole Location: | Sec:20 Twp: 1N 68W | Footage: 1324 FNL 1531 FEL | Depth | Log Types: | MWD, Mud, CBL (Resistivity in 123-38227) | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 153 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 160, Top: 0 ft., Bottom: 153 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2357 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1170, Top: 0 ft., Bottom: 2357 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16768 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2520, Top: 0 ft., Bottom: 16768 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4784 ft. | | | | SHANNON | 5439 ft. | | | | TEEPEE BUTTES | 6881 ft. | | | | SHARON SPRINGS | 7647 ft. | | | | NIOBRARA | 7676 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 12/1/2021 Interval Top: 7973 ft. Interval Bottom: 16718 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/10/2017 | Treatment End Date: | 10/17/2017 | Treatment Summary: | 335866 bbl water, 238 bbl additives (FRP-4K, ACI-97 and ASF-67) and 24 bbl HCl in a
51 stage frac with 7813145 lb of silica quartz proppant | Total fluid used in treatment (bbls): | 336128 | Max pressure during treatment (psi): | 9047 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 51 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 2303 | Fresh water used in treatment (bbls): | 336128 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 7813145 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | | Treatment Date: | 10/4/2017 | Treatment End Date: | 10/17/2017 | Treatment Summary: | Corrected treatment date(s).
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 770 | BBLS_OIL | 158 | BTU_GAS | 1254 | CALC_BBLS_H2O | 770 | CALC_BBLS_OIL | 158 | CALC_GOR | 1842 | CALC_MCF_GAS | 291 | CASING_PRESS | 2150 | GRAVITY_OIL | 47 | MCF_GAS | 291 | TUBING_PRESS | 1300 |
| Perforation Data: | Interval Top: | 7973 ft. | # Of Holes: | 10581 | Interval Bottom: | 16718 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 09/2023 - 08/2024 |
Total Oil Produced (Barrels) | 157 |
Total Gas Produced (MCF) | 843 |
GOR | 5369 |
GOR Determination | BOE |
Average BOE per Day | 0.829 |
Average MCFE per Day | 4.795 |
Federal Financial Assurance | i | |
|
|