|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/7/2019 Measured TD: 15657 ft. Vertical TD: 7533 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/7/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/4/2017 | Prop Depth/Form: | 15706 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1753 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 674, Top: 0 ft., Bottom: 1753 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15706 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 3717, Top: , Bottom: 15706 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15706 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 7548 ft., Bottom: 15706 ft. |
| | |
Wellbore Completed | Completion Date: | 3/22/2017 | Spud Date: | 10/20/2016 | Spud Date Is: | ACTUAL | Measured TD: | 15657 ft. | Measured PB depth: | 15574 ft. | True Vertical TD: | 7533 ft. | True Vertical PB depth: | 7534 ft. | Top PZ Location: | Sec:7 Twp: 1N 68W | Footage: 2305 FNL 263 FWL | Depth | Bottom Hole Location: | Sec:18 Twp: 1N 68W | Footage: 465 FSL 428 FWL | Depth | Log Types: | MWD, Mud, CBL, (Triple Combo in 123-38111) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1788 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 835, Top: 0 ft., Bottom: 1788 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 15623 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2372, Top: 0 ft., Bottom: 15623 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4488 ft. | | N | N | SHANNON | 5061 ft. | | N | N | TEEPEE BUTTES | 6592 ft. | | N | N | SHARON SPRINGS | 7499 ft. | | N | N | NIOBRARA | 7602 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 1/7/2019 Interval Top: 7796 ft. Interval Bottom: 15526 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 6/19/2017 | Treatment End Date: | 6/29/2017 | Treatment Summary: | Corrected treatment date(s).
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/8/2017 | Treatment End Date: | 6/29/2017 | Treatment Summary: | 294110 bbl water, 269 bbl additives (FRP-4K, ACI-97 and ASF-67) and 60 bbl HCl in a
40 stage frac with 6774905 lb of silica quartz proppant | Total fluid used in treatment (bbls): | 294439 | Max pressure during treatment (psi): | 8151 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 40 | Total acid used in treatment (bbls): | 60 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 11292 | Fresh water used in treatment (bbls): | 294110 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 6774905 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 315 | BBLS_OIL | 161 | BTU_GAS | 1298 | CALC_BBLS_H2O | 315 | CALC_BBLS_OIL | 161 | CALC_GOR | 3621 | CALC_MCF_GAS | 583 | CASING_PRESS | 2055 | GRAVITY_OIL | 50 | MCF_GAS | 583 |
| Perforation Data: | Interval Top: | 7796 ft. | # Of Holes: | 948 | Interval Bottom: | 15526 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 8605 |
Total Gas Produced (MCF) | 72671 |
GOR | 8445 |
GOR Determination | BOE |
Average BOE per Day | 57.753 |
Average MCFE per Day | 334.977 |
Federal Financial Assurance | i | |
|
|