Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38108
Well Classification: OW Status: PR - 1/7/2019
Well Name/No:Woolley Sosa #2B-7H-E168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/7/2019
FacilityID:434337LocationID:305447
County:WELD #123Location:SWNW 7 1N68W 6
Field:WATTENBERG - #90750Elevation:4994 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2242FNL  514 FWLLat/Long: 40.066855 / -105.053630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.066855 / -105.053630Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/19/2017
End Date: 6/29/2017
Reported: 11/15/2017
Days to report: 139
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/7/2019             Measured TD: 15657 ft.    Vertical TD: 7533 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/7/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2017
Proposed Top PZ Location:Sec:7 Twp: 1N 68W Footage: 2305 FNL  263 FWL
Bottom Hole Location:Sec:18 Twp: 1N 68W Footage: 465 FSL  428 FWL
Proposed Depth/Form:15706 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1753 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1753 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15706 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3717, Top: , Bottom: 15706 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15706 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 7548 ft., Bottom: 15706 ft.

Wellbore Completed
Completion Date:3/22/2017
Spud Date:10/20/2016Spud Date Is:ACTUAL
Measured TD:15657 ft.Measured PB depth:15574 ft.
True Vertical TD:7533 ft.True Vertical PB depth:7534 ft.
Top PZ Location:Sec:7 Twp: 1N 68WFootage: 2305 FNL  263 FWL
Bottom Hole Location:Sec:18 Twp: 1N 68WFootage: 465 FSL  428 FWL
Log Types:MWD, Mud, CBL, (Triple Combo in 123-38111)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 114, Top: 0 ft., Bottom: 98 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1788 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 0 ft., Bottom: 1788 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 15623 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2372, Top: 0 ft., Bottom: 15623 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4488 ft.NN
SHANNON5061 ft.NN
TEEPEE BUTTES6592 ft.NN
SHARON SPRINGS7499 ft.NN
NIOBRARA7602 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/7/2019                  Interval Top: 7796 ft.    Interval Bottom: 15526 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:6/19/2017Treatment End Date:6/29/2017
Treatment Summary:Corrected treatment date(s).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/8/2017Treatment End Date:6/29/2017
Treatment Summary:294110 bbl water, 269 bbl additives (FRP-4K, ACI-97 and ASF-67) and 60 bbl HCl in a 40 stage frac with 6774905 lb of silica quartz proppant
Total fluid used in treatment (bbls):294439Max pressure during treatment (psi):8151
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):11292
Fresh water used in treatment (bbls):294110Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6774905Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 315
BBLS_OIL 161
BTU_GAS 1298
CALC_BBLS_H2O 315
CALC_BBLS_OIL 161
CALC_GOR 3621
CALC_MCF_GAS 583
CASING_PRESS 2055
GRAVITY_OIL 50
MCF_GAS 583
Perforation Data:
Interval Top:7796 ft.# Of Holes:948
Interval Bottom:15526 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7748
Total Gas Produced (MCF)62801
GOR8105
GOR DeterminationBOE
Average BOE per Day50.927
Average MCFE per Day295.377

 Federal Financial Assurance  i 

 Tribal Well  i No