|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2017 Measured TD: 15221 ft. Vertical TD: 7569 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/11/2015 | | Proposed Top PZ Location: | Sec:22 Twp: 2n 68w | Footage: 635 FSL 1818 FWL | | Bottom Hole Location: | Sec:15 Twp: 2n 68w | Footage: 2657 FSL 1800 FWL | | Proposed Depth/Form: | 15273 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7924 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 449, Top: 500 ft., Bottom: 7924 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15273 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 291, Top: 7624 ft., Bottom: 15273 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2014 | | Spud Date: | 6/13/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15221 ft. | Measured PB depth: | 15201 ft. | | True Vertical TD: | 7569 ft. | True Vertical PB depth: | 7569 ft. | | Top PZ Location: | Sec:22 Twp: 2n 68w | Footage: 782 FSL 1808 FWL | | Bottom Hole Location: | Sec:15 Twp: 2n 68w | Footage: 2601 FSL 1733 FWL | | Log Types: | CBL/MWD/Resistivity/(IND run in API:123-23027) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 107 ft., Weight: 30 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 107 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 863 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 351, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8073 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 602, Top: 2500 ft., Bottom: 8073 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15203 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 553, Top: 7058 ft., Bottom: 15221 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7278 ft. | | | | | NIOBRARA | 7381 ft. | | | | | FORT HAYS | 7873 ft. | | | | | CODELL | 7951 ft. | | | |
Formation CODL Formation Classification: OW Status: PR - 10/1/2017 Interval Top: 8085 ft. Interval Bottom: 15152 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/10/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/30/2014 | Treatment End Date: | 11/8/2014 | | Treatment Summary: | Stage 1-47 treated with a total of 51864 bbl of fresh water with 485 bbl of additives and 887 bbl of recycled water with 4,984,231 lb of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 53236 | Max pressure during treatment (psi): | 8399 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 47 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.78 | | Recycled water used in treatment (bbls): | 887 | Total flowback volume recovered (bbls): | 1385 | | Fresh water used in treatment (bbls): | 52349 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 4984231 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7695 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/28/2014 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | BBLS_OIL | 384 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 92 | | CALC_BBLS_OIL | 384 | | CALC_GOR | 1310 | | CALC_MCF_GAS | 503 | | CASING_PRESS | 2390 | | GRAVITY_OIL | 50 | | MCF_GAS | 503 | | TUBING_PRESS | 1750 |
| | Perforation Data: | | Interval Top: | 8085 ft. | # Of Holes: | 1296 | | Interval Bottom: | 15152 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2031 |
| Total Gas Produced (MCF) | 73948 |
| GOR | 36409 |
| GOR Determination | MCFE |
| Average BOE per Day | 40.535 |
| Average MCFE per Day | 235.113 |
| Federal Financial Assurance | i | |
|
|