Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37893
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:D&C FARMS #36C-33HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:433985LocationID:433536
County:WELD #123Location:SESW 28 1N67W 6
Field:WATTENBERG - #90750Elevation:5011 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:767FSL  2186 FWLLat/Long: 40.016931 / -104.897073Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.016931 / -104.897073Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/1/2014
End Date: 4/3/2014
Reported: 5/23/2014
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 12952 ft.    Vertical TD: 7797 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/26/2015
Proposed Top PZ Location:Sec:33 Twp: 1N 67W Footage: 50 FNL  2450 FWL
Bottom Hole Location:Sec:33 Twp: 1N 67W Footage: 460 FSL  2450 FWL
Proposed Depth/Form:12931 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 380, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8170 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 860, Top: 0 ft., Bottom: 8170 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6966 ft., Depth: 12931 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/29/2013
Spud Date:9/11/2013Spud Date Is:ACTUAL
Measured TD:12952 ft.Measured PB depth:12928 ft.
True Vertical TD:7797 ft.True Vertical PB depth:7797 ft.
Top PZ Location:Sec:33 Twp: 1N 67WFootage: 5 FNL  2428 FWL
Bottom Hole Location:Sec:33 Twp: 1N 67WFootage: 463 FSL  2452 FWL
Log Types:CBL, GR, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1053 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 393, Top: 0 ft., Bottom: 1053 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8145 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 794, Top: 290 ft., Bottom: 8145 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7151 ft., Depth: 12937 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS7415 ft.
NIOBRARA7440 ft.
FORT HAYS8420 ft.
CODELL8948 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/1/2020                 Interval Top: 10554 ft.    Interval Bottom: 11615 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:10554-11615
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10554 ft.# Of Holes:0
Interval Bottom:11615 ft.Hole Size:0 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/30/2020                 Interval Top: 8939 ft.    Interval Bottom: 12952 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:8939-10554, 11615-12952
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8939 ft.# Of Holes:0
Interval Bottom:12952 ft.Hole Size:0 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/1/2020                 Interval Top: 8423 ft.    Interval Bottom: 8939 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:8423-8939
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8423 ft.# Of Holes:0
Interval Bottom:8939 ft.Hole Size:0 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/1/2020                 Interval Top: 8190 ft.    Interval Bottom: 8423 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/1/2020Treatment End Date:N/A
Treatment Summary:8190-8423
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8190 ft.# Of Holes:0
Interval Bottom:8423 ft.Hole Size:0 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/1/2023                  Interval Top: 8190 ft.    Interval Bottom: 12952 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:5/7/2014Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/1/2014Treatment End Date:4/3/2014
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 8190-12952. 48 BBL ACID,7760 BBL CROSSLINK GEL,1267 BBL LINEAR GEL,88169 BBL SLICKWATER,97244 BBL TOTAL FLUID. 230820# 30/50 OTTAWA/ST. PETERS SAND,2350900# 40/70 OTTAWA/ST. PETERS SAND,2581720# TOTAL SAND.
Total fluid used in treatment (bbls):97244Max pressure during treatment (psi):7132
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):2876Total flowback volume recovered (bbls):635
Fresh water used in treatment (bbls):94320Disposition method For flowback:RECYCLE
Total proppant used (lbs):2581720Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/9/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 293
BTU_GAS 1351
CALC_BBLS_OIL 293
CALC_GOR 1420
CALC_MCF_GAS 416
CASING_PRESS 2000
GRAVITY_OIL 50
MCF_GAS 416
Perforation Data:
Interval Top:8190 ft.# Of Holes:0
Interval Bottom:12952 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2875
Total Gas Produced (MCF)32239
GOR11213
GOR DeterminationBOE
Average BOE per Day23.201
Average MCFE per Day134.561

 Federal Financial Assurance  i 

 Tribal Well  i No