|
|
|
|
Wellbore #00 Wellbore Classification: Status: AB - 4/1/2014 Measured TD: 7767 ft. Vertical TD: 7381 ft. Wellbore Data for Original Wellbore | Wellbore Classification: AB - 4/1/2014 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/17/2015 | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 650 FSL 906 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 460 FNL 906 FWL | Proposed Depth/Form: | 11892 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1000 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7743 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 810, Top: 0 ft., Bottom: 7743 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6700 ft., Depth: 11892 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 9/23/2013 | Spud Date Is: | ACTUAL | Measured TD: | 7767 ft. | Measured PB depth: | 6565 ft. | True Vertical TD: | 7381 ft. | True Vertical PB depth: | 6565 ft. | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 460 FNL 1006 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 460 N 1006 W | Log Types: | THIS WELL WAS A SIDETRACK. LOGS WILL BE SUBMITTED WITH FINAL FORM 5 "01". | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1049 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1049 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1049 ft., Depth: 7767 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: OPEN HOLE , Top: 6565 ft., Depth: , Bottom: 7200 ft., Sacks: 359, Method: | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 4/1/2022 Measured TD: 12004 ft. Vertical TD: 7664 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 4/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/4/2015 | Proposed Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 622 FSL 1013 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 460 FNL 1006 FWL | Proposed Depth/Form: | 12004 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1048 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1048 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7766 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 810, Top: 0 ft., Bottom: 7766 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6970 ft., Depth: 12004 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 11/2/2013 | Spud Date: | 9/23/2013 | Spud Date Is: | ACTUAL | Measured TD: | 12004 ft. | Measured PB depth: | 11837 ft. | True Vertical TD: | 7664 ft. | True Vertical PB depth: | 7421 ft. | Top PZ Location: | Sec:10 Twp: 2N 67W | Footage: 675 FSL 1035 FWL | Bottom Hole Location: | Sec:10 Twp: 2N 67W | Footage: 483 N 1028 W | Log Types: | CBL, GR, MUD | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1049 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1049 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7827 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 770, Top: 180 ft., Bottom: 7827 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6796 ft., Depth: 11849 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4064 ft. | | | | SUSSEX | 4497 ft. | | | | SHARON SPRINGS | 7336 ft. | | | | NIOBRARA | 7466 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2022 Interval Top: 7855 ft. Interval Bottom: 11956 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/22/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/11/2014 | Treatment End Date: | 1/13/2014 | Treatment Summary: | COMPLETED THROUGH AN OPEN HOLE LINER FROM 7855-11956.
12972 BBL CROSSLINK GEL,786 BBL LINEAR GEL,100762 BBL SLICKWATER,114520 BBL TOTAL FLUID.
3030433# 40/70 GENOA/SAND HILLS SAND,378126# 30/50 OTTAWA/ST. PETERS SAND,3408559# TOTAL SAND.
| Total fluid used in treatment (bbls): | 114520 | Max pressure during treatment (psi): | 7288 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 32 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | 7500 | Total flowback volume recovered (bbls): | 1153 | Fresh water used in treatment (bbls): | 107020 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 3408559 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/8/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 28 | BBLS_OIL | 203 | BTU_GAS | 1283 | CALC_BBLS_H2O | 28 | CALC_BBLS_OIL | 203 | CALC_GOR | 1764 | CALC_MCF_GAS | 358 | CASING_PRESS | 1700 | GRAVITY_OIL | 45 | MCF_GAS | 358 |
| Perforation Data: | Interval Top: | 7855 ft. | # Of Holes: | 0 | Interval Bottom: | 11956 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 818 |
Total Gas Produced (MCF) | 20433 |
GOR | 24979 |
GOR Determination | MCFE |
Average BOE per Day | 11.857 |
Average MCFE per Day | 68.768 |
Federal Financial Assurance | i | |
|
|