|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2025 Measured TD: 15056 ft. Vertical TD: 7362 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/12/2015 | | Proposed Top PZ Location: | Sec:5 Twp: 2N 67W | Footage: 2551 FSL 995 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 67W | Footage: 460 FSL 1160 FWL | | Proposed Depth/Form: | 15109 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7672 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 434, Top: 500 ft., Bottom: 7672 ft. | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15109 ft., Weight: 13.5 , Citings Type: PLANNED | | Cement: | Sacks: 294, Top: 7372 ft., Bottom: 15109 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/23/2014 | | Spud Date: | 3/11/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 15056 ft. | Measured PB depth: | 15043 ft. | | True Vertical TD: | 7362 ft. | True Vertical PB depth: | 7362 ft. | | Top PZ Location: | Sec:5 Twp: 2n 67w | Footage: 2735 FNL 938 FWL | | Bottom Hole Location: | Sec:8 Twp: 2n 67w | Footage: 567 FSL 1196 FWL | | Log Types: | CBL/MWD/(IND run in API: 123-37816) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 432, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 861 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 333, Top: 0 ft., Bottom: 861 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7483 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 662, Top: 80 ft., Bottom: 7483 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 15046 ft., Weight: 13.50 , Citings Type: ACTUAL | | Cement: | Sacks: 576, Top: 5067 ft., Bottom: 15016 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHARON SPRINGS | 7053 ft. | | | | | NIOBRARA | 7159 ft. | | | | | FORT HAYS | 7538 ft. | | | | | CODELL | 7607 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 4/25/2018 Interval Top: 7645 ft. Interval Bottom: 15019 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/19/2014 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/29/2014 | Treatment End Date: | 8/8/2014 | | Treatment Summary: | Stages 1 - 49 treated with 105,571 bbls of fresh water, 12,547 bbls of recycled water, 23 bbls of 15% HCL acid, 531 bbls of additives, and 2,744,236 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 118672 | Max pressure during treatment (psi): | 8114 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 49 | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 12547 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 105571 | Disposition method For flowback: | | | Total proppant used (lbs): | 2744236 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7645 ft. | # Of Holes: | 1323 | | Interval Bottom: | 15019 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 11/1/2025 Interval Top: 7493 ft. Interval Bottom: 15019 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 11/19/2014 | Choke Size: | 16.000 in. | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/29/2014 | Treatment End Date: | 8/8/2014 | | Treatment Summary: | Stages 1 - 50 treated with 107,618 bbls of fresh water, 12,647 bbls of recycled water, 23 bbls of HCL 15%, 531 bbls of additives, and 2,747,134 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 120819 | Max pressure during treatment (psi): | 8114 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | 0.58 | | Recycled water used in treatment (bbls): | 12647 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 108149 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2747134 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7576 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/13/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 180 | | BTU_GAS | 1298 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 180 | | CALC_GOR | 7433 | | CALC_MCF_GAS | 1338 | | CASING_PRESS | 1651 | | GRAVITY_OIL | 50 | | MCF_GAS | 1338 | | TUBING_PRESS | 1316 |
| | Perforation Data: | | Interval Top: | 7493 ft. | # Of Holes: | 1350 | | Interval Bottom: | 15019 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 4/25/2018 Interval Top: 7493 ft. Interval Bottom: 7596 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 11/19/2014 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/29/2014 | Treatment End Date: | 8/8/2014 | | Treatment Summary: | Stage 50 treated with 2.047 bbls of fresh water, 100 bbls of recycled water and 2898 lbs of 40/70 sand proppant. | | Total fluid used in treatment (bbls): | 2147 | Max pressure during treatment (psi): | 3614 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | 100 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2047 | Disposition method For flowback: | | | Total proppant used (lbs): | 2898 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 7493 ft. | # Of Holes: | 27 | | Interval Bottom: | 7596 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 74 |
| Total Gas Produced (MCF) | 2955 |
| GOR | 39932 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.476 |
| Average MCFE per Day | 25.965 |
| Federal Financial Assurance | i | |
|
|