Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37785
Well Classification: OW Status: SI - 4/1/2022
Well Name/No:Lochbuie #2F-31H D165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2022
FacilityID:433797LocationID:433796
County:WELD #123Location:NWNW 31 1N65W 6
Field:WATTENBERG - #90750Elevation:5007 ft.
Planned Location:350FNL  1156 FWLLat/Long: 40.014080 / -104.712020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.014080 / -104.712021Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/6/2014
End Date: 4/10/2014
Reported: 6/21/2014
Originally Reported: 6/9/2014
Days to report: 72
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 4/1/2022             Measured TD: 11821 ft.    Vertical TD: 7487 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 4/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/6/2015
Proposed Top PZ Location:Sec:31 Twp: 1N 65W Footage: 595 FNL  2111 FWL
Bottom Hole Location:Sec:31 Twp: 1N 65W Footage: 460 FSL  2000 FWL
Proposed Depth/Form:12142 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1320 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 165, Top: 0 ft., Bottom: 1320 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 9701 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 556, Top: 1020 ft., Bottom: 9701 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12141 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 106, Top: 9401 ft., Bottom: 12141 ft.

Wellbore Completed
Completion Date:1/31/2014
Spud Date:1/19/2014Spud Date Is:ACTUAL
Measured TD:11821 ft.Measured PB depth:11809 ft.
True Vertical TD:7487 ft.True Vertical PB depth:7487 ft.
Top PZ Location:Sec:31 Twp: 1N 65WFootage: 580 FNL  2029 FWL
Bottom Hole Location:Sec:31 Twp: 1N 65WFootage: 835 S  2017 W
Log Types:MWD/CBL/(IND and DENS run in API:123-18761)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 432, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1502 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 466, Top: 0 ft., Bottom: 1509 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7917 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 1000 ft., Bottom: 7927 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 7927 ft., Depth: 11812 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6917 ft., Bottom: 11821 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
CODELL7791 ft.
NIOBRARA7707 ft.
SHARON SPRINGS7173 ft.
SUSSEX4670 ft.
TEEPEE BUTTES6000 ft.

Formation CODL                     Formation Classification:  OW                     Status:  SI - 4/1/2022                  Interval Top: 7941 ft.    Interval Bottom: 11784 ft.

 Completed Information for Formation CODELL
1st Production Date:5/29/2014Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/12/2014Treatment End Date:5/14/2014
Treatment Summary:Stage 1 - Stage 26 treated with a total of: 87,334 bbls of Slickwater Frac (ChemRock), 2,398 bbls of Pump Down No Chemicals, 2,321,765 lbs of 40/70 Proppant
Total fluid used in treatment (bbls):89732Max pressure during treatment (psi):8530
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:26
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1885
Fresh water used in treatment (bbls):89732Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2321765Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7585 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2014Test Method:Flows from well
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 199
BBLS_OIL 162
BTU_GAS 1298
CALC_BBLS_H2O 199
CALC_BBLS_OIL 162
CALC_GOR 1173
CALC_MCF_GAS 190
CASING_PRESS 1833
GRAVITY_OIL 50
MCF_GAS 190
TUBING_PRESS 1368
Perforation Data:
Interval Top:7941 ft.# Of Holes:729
Interval Bottom:11784 ft.Hole Size:0.4375 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
03/31/2022
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No