|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/8/2014 Measured TD: 14700 ft. Vertical TD: 7552 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/8/2014 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/25/2015 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 585 FNL 2124 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2078 FNL 1892 FWL | Proposed Depth/Form: | 14664 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 30 , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 140, Top: 0 ft., Bottom: 1114 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8014 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 455, Top: 814 ft., Bottom: 8014 ft. | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14664 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: 264, Top: 7714 ft., Bottom: 14664 ft. |
| | |
Wellbore Completed | Completion Date: | 11/16/2013 | Spud Date: | 11/1/2013 | Spud Date Is: | ACTUAL | Measured TD: | 14700 ft. | Measured PB depth: | 14677 ft. | True Vertical TD: | 7552 ft. | True Vertical PB depth: | 7262 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 585 FNL 2124 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2078 N 1892 W | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 65 , Citings Type: ACTUAL | Cement: | Sacks: 432, Top: 0 ft., Bottom: 97 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.6 in., Top: 0 ft., Depth: 1241 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 0 ft., Bottom: 1241 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7929 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 1232 ft., Bottom: 7939 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 6929 ft., Depth: 14681 ft., Weight: 13.5 , Citings Type: ACTUAL | Cement: | Sacks: 514, Top: 6929 ft., Bottom: 14681 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4786 ft. | | N | N | SHANNON | 5361 ft. | | N | N | TEEPEE BUTTES | 6777 ft. | | N | N | SHARON SPRINGS | 7333 ft. | | N | N | NIOBRARA | 7410 ft. | | N | N | FORT HAYS | 7732 ft. | | N | N | CODELL | 7822 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 7/8/2014 Interval Top: 7940 ft. Interval Bottom: 14634 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/3/2014 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/23/2014 | Treatment End Date: | 5/31/2014 | Treatment Summary: | Stages 1-44 treated with a total of: 71,665 bbls of slickwater and 4,091,531 lbs of 40/70 sand proppant. | Total fluid used in treatment (bbls): | 71665 | Max pressure during treatment (psi): | 7902 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 44 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 2650 | Total flowback volume recovered (bbls): | 805 | Fresh water used in treatment (bbls): | 69015 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 4091531 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7681 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/8/2014 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 325 | BTU_GAS | 1298 | CALC_BBLS_OIL | 325 | CALC_GOR | 480 | CALC_MCF_GAS | 156 | CASING_PRESS | 2324 | GRAVITY_OIL | 50 | MCF_GAS | 156 | TUBING_PRESS | 2034 |
| Perforation Data: | Interval Top: | 7940 ft. | # Of Holes: | 1164 | Interval Bottom: | 14634 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3587 |
Total Gas Produced (MCF) | 73666 |
GOR | 20536 |
GOR Determination | MCFE |
Average BOE per Day | 44.501 |
Average MCFE per Day | 258.112 |
Federal Financial Assurance | i | |
|
|