|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2023 Measured TD: 11080 ft. Vertical TD: 6654 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/25/2015 | Proposed Top PZ Location: | Sec:21 Twp: 6N 63W | Footage: 2312 FSL 879 FEL | Bottom Hole Location: | Sec:21 Twp: 6N 63W | Footage: 2310 FSL 535 FWL | Proposed Depth/Form: | 10868 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 890 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 890 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7090 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 480, Top: 0 ft., Bottom: 7090 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6940 ft., Depth: 10868 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 2/17/2014 | Spud Date: | 2/9/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11080 ft. | Measured PB depth: | 11080 ft. | True Vertical TD: | 6654 ft. | True Vertical PB depth: | 6654 ft. | Top PZ Location: | Sec:21 Twp: 6N 63W | Footage: 2291 FSL 884 FEL | Bottom Hole Location: | Sec:21 Twp: 6N 63W | Footage: 2309 S 537 W | Log Types: | CBL/Mud/Gamma | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 72, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 960 ft., Weight: 36.00 , Citings Type: ACTUAL | Cement: | Sacks: 449, Top: 0 ft., Bottom: 960 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7119 ft., Weight: 26.00 , Citings Type: ACTUAL | Cement: | Sacks: 575, Top: 1216 ft., Bottom: 7119 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7008 ft., Depth: 11065 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1033 ft. | | | | PARKMAN | 3563 ft. | | | | SUSSEX | 4119 ft. | | | | SHANNON | 4876 ft. | | | | NIOBRARA | 6732 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 2/1/2023 Interval Top: 7256 ft. Interval Bottom: 10996 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/21/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/23/2014 | Treatment End Date: | 4/24/2014 | Treatment Summary: | Frac'd the Niobrara W/ 2842862 gals of PermStim and Slick Water with 3929964#'s of Ottawa sand. | Total fluid used in treatment (bbls): | 67687 | Max pressure during treatment (psi): | 5793 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 19 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.92 | Recycled water used in treatment (bbls): | 4247 | Total flowback volume recovered (bbls): | 556 | Fresh water used in treatment (bbls): | 63440 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 3929964 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7013 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/27/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 287 | BBLS_OIL | 418 | BTU_GAS | 1276 | CALC_BBLS_H2O | 287 | CALC_BBLS_OIL | 418 | CALC_GOR | 942 | CALC_MCF_GAS | 394 | CASING_PRESS | 297 | GRAVITY_OIL | 59 | MCF_GAS | 394 | TUBING_PRESS | 861 |
| Perforation Data: | Interval Top: | 7256 ft. | # Of Holes: | 0 | Interval Bottom: | 10996 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1826 |
Total Gas Produced (MCF) | 31196 |
GOR | 17084 |
GOR Determination | MCFE |
Average BOE per Day | 19.626 |
Average MCFE per Day | 113.825 |
Federal Financial Assurance | i | |
|
|