|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2023 Measured TD: 9687 ft. Vertical TD: 5792 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/6/2015 | Proposed Top PZ Location: | Sec:9 Twp: 9N 58W | Footage: 1320 FNL 979 FEL | Bottom Hole Location: | Sec:9 Twp: 9N 58W | Footage: 1320 FNL 660 FWL | Proposed Depth/Form: | 9738 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Sec. 3, 4, 9, 10, 16 | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6125 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 420, Top: 0 ft., Bottom: 6125 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5975 ft., Depth: 9738 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 10/10/2013 | Spud Date: | 10/4/2013 | Spud Date Is: | ACTUAL | Measured TD: | 9687 ft. | Measured PB depth: | 9687 ft. | True Vertical TD: | 5792 ft. | True Vertical PB depth: | 5792 ft. | Top PZ Location: | Sec:9 Twp: 9N 58W | Footage: 1317 FNL 1142 FEL | Bottom Hole Location: | Sec:9 Twp: 9N 58W | Footage: 1341 N 681 W | Log Types: | CBL, MUD, GR | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 75 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1226 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 473, Top: 0 ft., Bottom: 1226 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6146 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 505, Top: 1194 ft., Bottom: 6146 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6041 ft., Depth: 9672 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 2207 ft. | | | | PARKMAN | 3291 ft. | | | | SUSSEX | 3913 ft. | | | | SHANNON | 4350 ft. | | | | TEEPEE BUTTES | 5046 ft. | | | | NIOBRARA | 5706 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2023 Interval Top: 6282 ft. Interval Bottom: 9606 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/25/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/22/2013 | Treatment End Date: | 11/23/2013 | Treatment Summary: | FRAC'D W/2025268 GAL SILVERSTIM AND SLICK WATER AND 2581500# OTTAWA SAND | Total fluid used in treatment (bbls): | 48221 | Max pressure during treatment (psi): | 4787 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 18 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | 2803 | Total flowback volume recovered (bbls): | 3195 | Fresh water used in treatment (bbls): | 45418 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 2581500 | Green completions techniques utilized: | No | Reason green techniques Not utilized: PRESSURE |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6051 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/29/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
BBLS_H2O | 306 | BBLS_OIL | 175 | BTU_GAS | 1138 | CALC_BBLS_H2O | 306 | CALC_BBLS_OIL | 175 | CALC_GOR | 589 | CALC_MCF_GAS | 103 | GRAVITY_OIL | 40 | MCF_GAS | 103 | TUBING_PRESS | 240 |
| Perforation Data: | Interval Top: | 6282 ft. | # Of Holes: | 0 | Interval Bottom: | 9606 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1153 |
Total Gas Produced (MCF) | 9737 |
GOR | 8444 |
GOR Determination | BOE |
Average BOE per Day | 7.751 |
Average MCFE per Day | 44.966 |
Federal Financial Assurance | i | |
|
|