|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2024 Measured TD: 10168 ft. Vertical TD: 5689 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 5/23/2015 | Proposed Top PZ Location: | Sec:3 Twp: 9N 58W | Footage: 1319 FSL 452 FWL | Bottom Hole Location: | Sec:3 Twp: 9N 58W | Footage: 1320 FSL 660 FEL | Proposed Depth/Form: | 10458 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-302 , Unit Acreage: 3200, Drill Unit: Please see comments | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1150 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 520, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6284 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 460, Top: , Bottom: 6284 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6134 ft., Depth: 10458 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/28/2014 | Spud Date: | 9/20/2014 | Spud Date Is: | ACTUAL | Measured TD: | 10168 ft. | Measured PB depth: | 10164 ft. | True Vertical TD: | 5689 ft. | True Vertical PB depth: | 5689 ft. | Top PZ Location: | Sec:3 Twp: 9N 58W | Footage: 1413 FSL 562 FWL | Bottom Hole Location: | Sec:3 Twp: 9N 58W | Footage: 1319 S 661 E | Log Types: | USIT, MUD, MWD | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 124 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 1192 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 473, Top: 0 ft., Bottom: 1192 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6020 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 639, Top: 1205 ft., Bottom: 6020 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5790 ft., Depth: 10164 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 347, Top: 5790 ft., Bottom: 10164 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 534 ft. | | | | PIERRE | 2176 ft. | | | | PARKMAN | 3240 ft. | | | | SUSSEX | 3894 ft. | | | | SHANNON | 4312 ft. | | | | TEEPEE BUTTES | 5053 ft. | | | | NIOBRARA | 5813 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/1/2024 Interval Top: 6083 ft. Interval Bottom: 10057 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/22/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/19/2014 | Treatment End Date: | 11/26/2014 | Treatment Summary: | PERF'D 6083-10057'; FRAC'D W/5391118 GALS SILVERSTIM AND SLICK WATER, 588 GAL 7.5% HCL AND 4237477# OTTAWA SAND | Total fluid used in treatment (bbls): | 128373 | Max pressure during treatment (psi): | 5603 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 22 | Total acid used in treatment (bbls): | 14 | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | 54567 | Total flowback volume recovered (bbls): | 2495 | Fresh water used in treatment (bbls): | 73792 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4237477 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5762 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/30/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 750 | BBLS_OIL | 331 | BTU_GAS | 1299 | CALC_BBLS_H2O | 750 | CALC_BBLS_OIL | 331 | CALC_GOR | 830 | CALC_MCF_GAS | 275 | CASING_PRESS | 809 | GRAVITY_OIL | 39 | MCF_GAS | 275 | TUBING_PRESS | 213 |
| Perforation Data: | Interval Top: | 6083 ft. | # Of Holes: | 520 | Interval Bottom: | 10057 ft. | Hole Size: | 0.68 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 211 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 0.577 |
Average MCFE per Day | 3.347 |
Federal Financial Assurance | i | |
|
|