Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37332
Well Classification: OW Status: SI - 10/1/2023
Well Name/No:Alm #33V-234
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2023
FacilityID:432873LocationID:432871
County:WELD #123Location:NENE 33 7N65W 6
Field:WATTENBERG - #90750Elevation:4790 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1203FNL  330 FELLat/Long: 40.534660 / -104.660020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.534662 / -104.660015Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/20/2015
End Date: 6/21/2015
Reported: 6/22/2015
Days to report: 1
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 10/1/2023             Measured TD: 11383 ft.    Vertical TD: 6967 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 10/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/15/2015
Proposed Top PZ Location:Sec:33 Twp: 7N 65W Footage: 1726 FNL  816 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65W Footage: 1743 FNL  500 FWL
Proposed Depth/Form:11439 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7498 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7498 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6296 ft., Depth: 11439 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/15/2015
Spud Date:4/8/2015Spud Date Is:ACTUAL
Measured TD:11383 ft.Measured PB depth:11376 ft.
True Vertical TD:6967 ft.True Vertical PB depth:6967 ft.
Top PZ Location:Sec:33 Twp: 7N 65WFootage: 1721 FNL  944 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65WFootage: 1746 FNL  500 FWL
Log Types:CBL, MWD (DIL in 123-23733)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 927 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 927 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7494 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 100 ft., Bottom: 7494 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7053 ft., Depth: 11379 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3774 ft.
SUSSEX4534 ft.
SHANNON5224 ft.
SHARON SPRINGS6686 ft.
NIOBRARA6918 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 10/1/2023                 Interval Top: 7550 ft.    Interval Bottom: 11383 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/6/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/20/2015Treatment End Date:6/21/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 78,391 bbls Gel Fluid: 60,693 bbls Slickwater Fluid: 17,698 bbls Total Proppant: 4,360,160 lbs Silica Proppant: 4,360,160 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):78391Max pressure during treatment (psi):4163
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3921
Fresh water used in treatment (bbls):78391Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4360160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7007 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 372
BBLS_OIL 151
BTU_GAS 1275
CALC_BBLS_H2O 372
CALC_BBLS_OIL 151
CALC_GOR 1152
CALC_MCF_GAS 174
CASING_PRESS 1353
GRAVITY_OIL 50
MCF_GAS 174
TUBING_PRESS 690
Perforation Data:
Interval Top:7550 ft.# Of Holes:
Interval Bottom:11383 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
01/29/2025
Defined Inactive (SI)YLast Production
09/30/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No